FIELD: oil industry, particularly well bottom zone treatment in carbonate reservoir.
SUBSTANCE: method involves lowering flow string sealed from bottom end and provided with filtering fitting and packer so that filtering packer is installed 2-4 m above productive formation bottom; circulating 10-15% hydrochloric acid solution in amount of 10-20 hole annuity volumes through the well; blocking flow string at well head; forcing 10-15% hydrochloric acid solution with high-gravity oil into productive formation through hole annuity, wherein high-gravity oil flow-rate is 24-35m3/day and pressure at flow string head is 0.8-1.2 MPa; opening flow string at well head; repeatedly circulating 10-15% hydrochloric acid solution in amount of 10-20 hole annuity volumes through the well along with displacing high-gravity oil in tank; repeatedly closing flow string at well head and forcing 10-15% hydrochloric acid solution with high-gravity oil into productive formation through hole annuity, wherein high-gravity oil flow-rate is 24-35m3/day and pressure at flow string head is 0.8-1.2 MPa; repeating above circulation and forcing operations; forcing all remaining acid solution with high-gravity oil during the final operation performing; installing packer above productive formation interval; performing technological time delay for 1-2 hours to provide acid reaction; performing swabbing through flow string with rate of 70-100 m3/day; lifting underground equipment for 24-48 hours; lowering screw pump and bringing the well into operation.
EFFECT: increased efficiency of well bottom zone treatment.
1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF WELL OPERATION | 2007 |
|
RU2335622C1 |
PROCEDURE FOR TREATMENT OF BOTTOMHOLE ZONE OF WELL | 2009 |
|
RU2398960C1 |
METHOD FOR HORIZONTAL WELL BOTTOM ZONE INTERVAL TREATMENT | 2007 |
|
RU2318999C1 |
METHOD FOR BOTTOMHOLE ZONE OF TERRIGENOUS FORMATION TREATMENT | 2005 |
|
RU2278967C1 |
METHOD OF TREATING HOLE-BOTTOM ZONE OF WELL | 0 |
|
SU1559127A1 |
PROCEDURE FOR TREATMENT OF BOTTOMHOLE ZONE OF PRODUCER | 2013 |
|
RU2527085C1 |
PROCESS OF TREATMENT OF OIL POOL | 1998 |
|
RU2135760C1 |
METHOD FOR PERFORATING WELL AND PROCESSING BOTTOM-HOLE CARBONATE FORMATION ZONE | 2017 |
|
RU2667239C1 |
DEVELOPMENT METHOD OF BOTTOM-HOLE ZONE | 2012 |
|
RU2506422C1 |
WELL BOTTOM HOLE TREATMENT METHOD | 2002 |
|
RU2224089C1 |
Authors
Dates
2005-12-20—Published
2004-12-14—Filed