FIELD: oil production, particularly equipment for well bottom zone cleaning by exerting hydropulsive action on well bottom zone.
SUBSTANCE: device comprises flow distribution with chemical reagent injection channel, nozzle, mixing chamber and pressure accumulator. The pressure accumulator comprises elastic ball and body with contraction tube and diffuser. The second channel with check valve is formed in distributor body. Shutoff valve with differential piston is installed in the first channel. The greater piston diameter faces bottomhole formation zone. Pressure accumulator with elastic ball arranged in lower part thereof is provided with movable seat and return spring resting upon protective grid.
EFFECT: increased oil output from well due to improved collecting properties, possibility of well bottom treatment only through tubing string.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
JET ASSEMBLY FOR CHEMICAL TREATMENT OF BOTTOMHOLE ZONE | 2006 |
|
RU2330995C1 |
MOBILE THROUGH HYDROIMPULSIVE RIG FOR BOTTOMHOLE RESERVOIR ZONE CLEANING | 2006 |
|
RU2320863C1 |
METHOD AND DEVICE FOR REAGENT AND IMPULSE WELL AND PRODUCTIVE BED TREATMENT | 2005 |
|
RU2275495C1 |
METHOD FOR PROCESSING THE BOTTOMHOLE FORMATION ZONE AND THE DEVICE FOR ITS IMPLEMENTATION | 2022 |
|
RU2782227C1 |
HYDROIMPULSIVE PLANT FOR WELL DEVELOPMENT | 2004 |
|
RU2267609C2 |
DOWNHOLE EQUIPMENT FOR POLYFREQUENCY WAVE TREATMENT OF BOTTOM-HOLE ZONE OF PRODUCTIVE FORMATION AND FLOWRATE OSCILLATIONS GENERATOR FOR THAT | 2014 |
|
RU2574651C1 |
DEVICE FOR TREATMENT AND RECOVERY OF FORMATION PRODUCTIVITY | 2012 |
|
RU2494220C1 |
HYDROIMPULSIVE WELL DEVELOPMENT PLANT | 2004 |
|
RU2263207C1 |
METHOD FOR MOBILE VIBRATORY-CHEMICAL BOTTOMHOLE FORMATION ZONE CLEANING PLANT OPERATION | 2006 |
|
RU2315862C1 |
METHOD OF DEVELOPMENT AND EXPLORATION OF WELLS AND OF INTENSIFYING OF OIL-GAS INFLUX OF HEAVY HIGH VISCOUS OILS AND FACILITY FOR IMPLEMENTATION OF THIS METHOD | 2007 |
|
RU2340769C1 |
Authors
Dates
2006-01-10—Published
2004-02-16—Filed