FIELD: oil production, particularly gas and oil well development.
SUBSTANCE: device has pressure accumulator with elastic ball, as well as pump drive, medium separator and borehole pump with suction and pressure valves. Pressure accumulator is provided with movable seat arranged in lower part thereof. Pump drive and borehole pump have equidimensional pistons fixedly connected one to another through hollow rod with valves installed at both ends thereof and with one or several radial orifices. Said orifices are arranged above borehole pump piston. One or several radial orifices are located in lower pump drive part.
EFFECT: increased efficiency of well development due to hydroimpulsive action application to productive bed in the case of low and abnormally low bed pressure, reduced operational costs.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
HYDROIMPULSIVE WELL DEVELOPMENT PLANT | 2004 |
|
RU2263207C1 |
HYDROIMPULSIVE WELL BOTTOM ZONE TREATMENT DEVICE | 2004 |
|
RU2267608C2 |
MOBILE THROUGH HYDROIMPULSIVE RIG FOR BOTTOMHOLE RESERVOIR ZONE CLEANING | 2006 |
|
RU2320863C1 |
METHOD OF DEVELOPMENT AND EXPLORATION OF WELLS AND OF INTENSIFYING OF OIL-GAS INFLUX OF HEAVY HIGH VISCOUS OILS AND FACILITY FOR IMPLEMENTATION OF THIS METHOD | 2007 |
|
RU2340769C1 |
OIL PRODUCTION METHOD AND DEVICE | 2006 |
|
RU2322570C2 |
DEVICE FOR INDUCING INFLOW OF FORMATION FLUID | 1991 |
|
RU2015317C1 |
PROCESSING OF WELLBORE ZONE OF FORMATION | 2013 |
|
RU2525563C1 |
PROCESS OF ACCEPTANCE AND EXAMINATION OF WELLS, OF INTENSIFICATION OF OIL AND GAS INFLOWS, OF CONDUCTING WATER- INSULATION WORK AND GEAR FOR IMPLEMENTATION OF PROCESS | 2001 |
|
RU2179631C1 |
METHOD FOR PROCESSING THE BOTTOMHOLE FORMATION ZONE AND THE DEVICE FOR ITS IMPLEMENTATION | 2022 |
|
RU2782227C1 |
METHOD AND ARRANGEMENT OF HYDRAM FOR BOTTOMHOLE FORMATION AREA AND WELL DEVELOPMENT | 2013 |
|
RU2534116C1 |
Authors
Dates
2006-01-10—Published
2004-01-26—Filed