FIELD: oil production, particularly well development and oil production stimulation.
SUBSTANCE: mobile through hydroimpulsive rig comprises hydroimpulsive pump with pressure accumulator connected thereto. Pressure accumulator comprises check valve with locking member, namely ball, valve seat and rod. Pressure accumulator is arranged in lower part of downhole rig. The rod is hollow and carries seat. Ball is made of steel and may be dropped onto valve seat after reactive bath accompanied by hydraulic impacts application through hollow rod. Pressure accumulator has resilient valve and sized orifice, which create additional hydraulic impact.
EFFECT: increased technological and economical efficiency of well development methods, possibility to clean bottomhole reservoir zone and improved oil production stimulation due to creation of multiple depressions with reactive bath forming in under-packer zone in one trip.
4 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
HYDROIMPULSIVE PLANT FOR WELL DEVELOPMENT | 2004 |
|
RU2267609C2 |
METHOD OF DEVELOPMENT AND EXPLORATION OF WELLS AND OF INTENSIFYING OF OIL-GAS INFLUX OF HEAVY HIGH VISCOUS OILS AND FACILITY FOR IMPLEMENTATION OF THIS METHOD | 2007 |
|
RU2340769C1 |
PROCESS OF ACCEPTANCE AND EXAMINATION OF WELLS, OF INTENSIFICATION OF OIL AND GAS INFLOWS, OF CONDUCTING WATER- INSULATION WORK AND GEAR FOR IMPLEMENTATION OF PROCESS | 2001 |
|
RU2179631C1 |
HYDROIMPULSIVE WELL DEVELOPMENT PLANT | 2004 |
|
RU2263207C1 |
HYDROIMPULSIVE WELL BOTTOM ZONE TREATMENT DEVICE | 2004 |
|
RU2267608C2 |
TREATMENT METHOD OF BOREHOLE ZONE OF LOW-PERMEABLE BED AND DEVICE FOR ITS IMPLEMENTATION | 2018 |
|
RU2703093C2 |
METHOD OF HYDRODYNAMIC ACTION ON BOTTOM-HOLE FORMATION ZONE | 2011 |
|
RU2483200C1 |
METHOD FOR PROCESSING THE BOTTOMHOLE FORMATION ZONE AND THE DEVICE FOR ITS IMPLEMENTATION | 2022 |
|
RU2782227C1 |
METHOD FOR PROCESSING THE BOTTOM-HOLE ZONE OF THE FORMATION AND A JET PUMP AS PART OF A DEVICE FOR IMPLEMENTING THE METHOD | 2022 |
|
RU2783932C1 |
METHOD FOR MOBILE VIBRATORY-CHEMICAL BOTTOMHOLE FORMATION ZONE CLEANING PLANT OPERATION | 2006 |
|
RU2315862C1 |
Authors
Dates
2008-03-27—Published
2006-06-05—Filed