FIELD: building, particularly to form roof of cane.
SUBSTANCE: method involves forming sheaves of cane stems; tightly laying the sheaves on previously prepared roof slope and fastening thereof to the rood slope; smoothing the cane stems to create uniform cane stem layer and finally securing the cane to the roof slope; laying the second and the third cane layers in the same manner.
EFFECT: increased efficiency.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
ROOFING STRUCTURE | 2006 |
|
RU2307904C1 |
FLEXIBLE TILE LAYING METHOD | 2005 |
|
RU2305733C2 |
LIGHT MOLDED TILE WITH INTEGRATED SOLAR MODULES | 2014 |
|
RU2707813C2 |
ANTI-ICING ROOFING OF SLOPING OR CONDITIONALLY FLAT ROOFS, RECONSTRUCTION METHOD FOR EXISTENT OUTER ORGANIZED WATER DRAINAGE SYSTEM, WHICH DRAINS WATER, PREFERABLY WATER FROM MELTED SNOW, FROM INCLINED METAL ROOFING, AND ANTI-ICING WALL GUTTER FOR ABOVE RECONSTRUCTION REALIZATION | 2005 |
|
RU2301869C2 |
MOSAIC CONSTRUCTION SET OF WOOD FOR FACING WALLS AND CEILINGS AND METHOD OF PRODUCTION AND ASSEMBLY THEREOF | 2020 |
|
RU2738827C1 |
SYSTEMS, METHODS AND DEVICES FOR INSULATING THE SPACE ADJACENT TO THE UPPER PART OF THE ATTIC | 2017 |
|
RU2738063C2 |
METHOD AND APPARATUS FOR MOUNTING THERMOCOUPLES INTO POLYMERISABLE MATERIAL SAMPLES | 2018 |
|
RU2690919C1 |
METHOD FOR AUTOMATED CONSTRUCTION OF STRUCTURES | 2021 |
|
RU2761783C1 |
DOUBLE-WALLED VAULTED BUILDING STRUCTURE ERECTION METHOD | 2003 |
|
RU2261959C2 |
AEROGYDRODYNAMIC KEY BUOY AND METHOD OF CROPPING OF SURFACE OBJECTS OF FISHING | 2016 |
|
RU2641898C1 |
Authors
Dates
2006-01-20—Published
2004-01-16—Filed