FIELD: construction, particularly to prevent icicle formation on sloping and conditionally flat roofs, as well as existent metal roofing reconstruction.
SUBSTANCE: method involves creating water-tight flange of impervious material at lower edge of eaves gutter, wherein the flange may be made as conventional wall gutter; forming dosing orifices for snow water droplets removal from roof in lower connection points thereof.
EFFECT: decreased snow water heat losses during gravity flow thereof towards outer drain system along with decreased ice formation on eaves gutter surface, prevention of initial icicle creation on lower horizontal eaves gutter edge under normal thermal-physic processes and decreased icicle formation in the case of organized outer water flow conversion into non-organized water flow over eaves gutter edge under adverse thermal-physic processes.
25 cl, 11 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO DRAIN WATER FROM MELTED SNOW AND RAIN WATER FROM THE OUTSIDE OF INCLINED ROOF | 2005 |
|
RU2299956C2 |
ROOF | 2012 |
|
RU2495985C1 |
ROOFING WITH MEANS TO PREVENT THE FORMATION OF ICE AND ICICLES | 2021 |
|
RU2779365C1 |
METAL ROOF AND ROOF BUILDING METHOD | 2004 |
|
RU2273706C1 |
BUILDING WITH PITCHED ROOF HAVING DEVICE FOR PREVENTION OF FORMATION OF ICICLES, ICE CRUST AND SNOW CORNICES ON ROOF | 2011 |
|
RU2481443C1 |
METHOD FOR DRAINING THAWN WATER FROM EXISTING SOFT ROOFING IN WINTER PERIOD | 1994 |
|
RU2081977C1 |
ARRANGEMENT OF BUILDING AND STRUCTURE ROOF | 2012 |
|
RU2494199C1 |
DEVICE FOR REMOVAL OF SNOW AND ICE FROM ROOF LARMIER | 2009 |
|
RU2392398C1 |
ARANGEMENT OF BUILDING AND STRUCTURE ROOF | 2007 |
|
RU2338853C1 |
EXTERNAL DRAINAGE SYSTEM FROM THE ROOFING OF THE BUILDING | 2015 |
|
RU2667559C2 |
Authors
Dates
2007-06-27—Published
2005-10-04—Filed