METHOD FOR ACCIDENT PREVENTION AND ELIMINATION, AS WELL AS FOR DRILLING PROBLEMS AVOIDANCE DURING DRILLING OPERATION PERFORMING Russian patent published in 2006 - IPC E21B21/08 

Abstract RU 2272121 C1

FIELD: well drilling, particularly well drilling with controlling or monitoring pressure or flow of drilling fluid.

SUBSTANCE: method involves including mudding device in drilling string assembly along with setting predetermined drilling fluid pressure drop at drilling bit; lowering drilling string assembly into well; switching-on mud pumps and performing hydrodynamic well wall treatment with mugging device during well drilling. During drilling of well intervals complicated with oil and gas ingress a number of parameters is recorded and controlled with the use of land-based information-measuring system to determine hydrodynamic well wall treatment time. The parameters to be recorded and controlled are gas content in drilling mud at outlet, mechanical drilling speed; drilling mud level in vessels; drilling mud flow rate at inlet/outlet; drilling mud pressure at inlet, drilling mud temperature at inlet, electric resistance of drilling mud at outlet, drilling mud density at inlet and drilling mud flow velocity at outlet. Rotor torque is measured and hook load is also controlled.

EFFECT: prevention of accidents connected with drilling mud absorption by well wall and with well hole fluctuation, increased reliability and efficiency of well hole treatment.

3 cl

Similar patents RU2272121C1

Title Year Author Number
EMERGENCY SITUATION PREDICTION METHOD WHEN CONSTRUCTING OIL AND GAS WELLS 2007
  • Korobov Aleksandr Dmitrievich
  • Korobova Ljudmila Aleksandrovna
RU2352966C1
METHOD FOR DRILLING WELLS UNDER COMPLICATED CONDITIONS 0
  • Podvarkov Georgij Andreevich
  • Rakhimov Akbar Kamilovich
  • Alekhin Stanislav Afanasevich
  • Strelko Iosif Shmulevich
  • Tugushev Rasim Shakhimardanovich
  • Mariampolskij Naum Akimovich
  • Klimashkin Igor Ivanovich
SU977695A1
METHOD OF WELL DRILLING IN HIGH-PERMEABILITY INCOMPETENT GAS-CONTAINING FORMATIONS 1996
  • Dubenko V.E.
  • Andrianov N.I.
  • Kuligin A.V.
RU2121558C1
METHOD FOR ADVANCE DRILLING OF PILOT SHAFTS DURING CONSTRUCTION OF WELLS ON SHELF 2023
  • Rybin Nikita Alekseevich
  • Ivanov Nikolaj Aleksandrovich
  • Khoshtariya Vladislav Nikolaevich
  • Trifonov Aleksej Nikolaevich
  • Kozhukhov Donat Vladimirovich
RU2818392C1
HYDRO-JET-MECHANICAL PROCEDURE FOR DECREASING PERMEABILITY OF WELL WALLS 2010
  • Salikhov Mirsaif Mirgazijanovich
  • Taipova Venera Askhatovna
  • Kateeva Raisa Irekovna
  • Kateev Rustem Irekovich
  • Lukonin Aleksandr Mikhajlovich
  • Starov Oleg Evgen'Evich
RU2428560C1
METHOD FOR WELL CONSTRUCTION 2012
  • Khisamov Rais Salikhovich
  • Vakula Andrej Jaroslavovich
  • Starov Oleg Evgen'Evich
  • Galimov Razif Khirazetdinovich
  • Taipova Venera Asgatovna
  • Bachkov Al'Bert Petrovich
RU2494214C1
CONSTRUCTION METHOD OF WELL SHAFT THROUGH UNSTABLE CLAY MINE ROCKS 2012
  • Khisamov Rais Salikhovich
  • Khaminov Nikolaj Ivanovich
  • Bachkov Al'Bert Petrovich
  • Starov Oleg Evgen'Evich
RU2474669C1
METHOD FOR MONITORING BOTTOM-HOLE PARAMETERS DURING WELL DRILLING 2013
  • Fursin Sergej Georgievich
RU2643380C2
GEAR FOR GROUTING OF WALLS OF WELL WITH MUD 1992
  • Vdovenko A.I.
  • Minenkov V.M.
  • Jarysh A.T.
  • Burykin A.N.
RU2219324C2
METHOD FOR PREDICTING STICKING OF DRILLING PIPES IN PROCESS OF DRILLING BOREHOLE IN REAL TIME 2020
  • Shestakov Aleksandr Leonidovich
  • Kodirov Shakhboz Sharifovich
RU2753289C1

RU 2 272 121 C1

Authors

Lugumanov Mansur Gajanovich

Strugovets Evgenij Viktorovich

Dates

2006-03-20Published

2004-06-10Filed