FIELD: oil and gas production.
SUBSTANCE: procedure consists in simultaneous effecting permeable walls of well borehole with scrapers for removal of filtration crust and with high-pressure jets generated from hydro-monitored heads of mud injector during well bottom hole deepening with drilling. Also, hydro-jets are directed at angle towards each other, they converge at one point on the wall of the well and destroy their nuclei, thus preventing destruction of walls of the well and formation of cavities. Well walls are subjected to the similar effect when the well is treated before lowering a producer for cementing. Drill agent containing dispersed solid particles is used as fluid for high-pressure hydraulic jets.
EFFECT: raised efficiency of mud fill, reduced expenditures for emergency-recovery operations and time for construction of well.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
JETTING ROPE SCRAPER | 2014 |
|
RU2571475C1 |
PROCEDURE FOR INCREASING STRENGTH OF CONTACT OF ANNULUS CEMENT STONE WITH ENVIRONMENT IN WELL | 2007 |
|
RU2366800C2 |
COMPLEX METHOD FOR WELL BORE PREPARATION FOR CASING | 2006 |
|
RU2318980C2 |
JET CLEANING DEVICE FOR WELL SHAFT | 2011 |
|
RU2471958C1 |
DEVICE FOR PERFORMANCE OF COLMATAGE OF WELL WALLS IN COURSE OF DRILLING | 1989 |
|
RU1750281C |
PROCEDURE FOR FIXING WELL WITH CEMENT GROUT | 2009 |
|
RU2398955C1 |
METHOD TO STRENGTHEN WELL AND DEVICE FOR ITS IMPLEMENTATION | 2000 |
|
RU2190754C2 |
METHOD FOR STRING CEMENTING IN WELL USING CEMENT MORTAR WITH EROSION PROPERTIES | 2009 |
|
RU2398095C1 |
JET CONE DRILLING BIT | 1999 |
|
RU2168600C1 |
METHOD FOR RECOVERY OF RESERVOIR NATURAL PROPERTIES, IMPAIRED DURING ITS OPENING WITH BORING | 2008 |
|
RU2382188C1 |
Authors
Dates
2011-09-10—Published
2010-08-19—Filed