FIELD: engineering of testing equipment.
SUBSTANCE: method includes measuring pressure and temperature in isolated volume at beginning time moment, calibrated flow of gas phase of working body during control time span with following measuring of pressure and temperature in isolated volume. On basis of measured pressure and temperature control speed of pressure measuring during control time is determined, in fixed time spans pressure and temperature are measured in isolated volume during cease of working body influx. At each fixed time span current speed of pressure change is determined. As calibrated flow of gas phase of working body, flowing of ionized gas from isolated volume through plasma source is taken. As control time, time of operation of aforementioned plasma source is taken. Measuring of parameters is performed, characterizing operation of plasma source, on basis of which control flow of working body from isolated volume is determined, and on basis of it control pressure change speed is determined. Determining of impermeability level is performed by comparing current pressure measuring speed with control pressure measuring speed, received on basis of parameters, characterizing operation of plasma source.
EFFECT: improved precision of tests.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR TIGHTNESS DETECTION OF SYSTEM FOR WORKING FLUID SUPPLY TO SOURCE OF PLASMA, PREFERABLY UNDER VACUUM CONDITIONS | 2008 |
|
RU2377522C1 |
METHOD FOR DETERMINATION OF AIR-TIGHTNESS OF SPACECRAFT ISOLATED VOLUME IN THE CONDITIONS OF SPACE FLIGHT | 2001 |
|
RU2213943C2 |
METHOD FOR DEFINITION OF FLOW RATE OF SYSTEM FOR SUPPLY OF WORKING MEDIUM TO PLASMA SOURCE | 2008 |
|
RU2392589C2 |
DEVICE FOR DETERMINATION OF THRUST OF STATIONARY PLASMA ENGINE | 2022 |
|
RU2786669C1 |
METHOD OF SPACECRAFT TEMPERATURE CONTROL | 2003 |
|
RU2262469C2 |
BALLISTIC SUPPORT OF SPACECRAFT FLIGHT | 2013 |
|
RU2549582C2 |
BALLISTIC SUPPORT OF SPACECRAFT FLIGHT | 2013 |
|
RU2572003C2 |
PROCEDURE LOCATING LEAKS FROM SPACECRAFT COMPARTMENT AND DEVICE TO IMPLEMENT IT | 1999 |
|
RU2160438C2 |
METHOD FOR CHECKING TIGHTNESS OF METAL-HYDROGEN BATTERY | 2004 |
|
RU2262162C1 |
METHOD FOR CONTROLLING RESERVOIR SEALING TIGHTNESS | 2005 |
|
RU2298774C1 |
Authors
Dates
2006-03-20—Published
2004-05-13—Filed