FIELD: hydraulic building, particularly to erect hydraulic structures and to built, reconstruct and repair pressure pipelines subjected to atmospheric actions.
SUBSTANCE: water pipeline comprises metal facing and reinforced concrete shell. Outer reinforced concrete shell surface is provided with roofing cover made of corrosion-resistant sheet material. Vent channels are formed between roofing cover and reinforced concrete shell. The vent channels may be provided with air intake devices having gates provided with automatic or manual drives. Removable inventory air dryers and air heaters may be arranged in vent channels.
EFFECT: increased service life and increased resistance of reinforced concrete shell subjected to repeatedly freezing and thawing due to provision of dry concrete condition during pipeline operation.
5 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO INCREASE RELIABILITY AND DURABILITY OF STEEL REINFORCED CONCRETE TURBINE WATER CONDUIT | 2010 |
|
RU2433222C1 |
PRESSURE PENSTOCK MADE OF STEEL AND REINFORCED CONCRETE | 2003 |
|
RU2235826C1 |
TURBINE WATER CONVEYANCE STRUCTURE | 2004 |
|
RU2275463C2 |
METHOD TO INCREASE RELIABILITY OF CONCRETE ARC GRAVITATION DAM UNDER OPERATION | 2010 |
|
RU2434993C1 |
METHOD TO INCREASE RELIABILITY OF CONCRETE ARC-GRAVITY DAM IN OPERATION | 2010 |
|
RU2418911C1 |
JOINT OF LARGE-DIAMETER PRESSURE PIPELINES | 0 |
|
SU1425270A1 |
DESIGN OF DISCHARGE COMPOSITE REINFORCED CONCRETE (REINFORCED CONCRETE) WATER CONDUITS IN SOFT SOILS | 2009 |
|
RU2413053C1 |
SEALING OF MOVEMENT JOINT OF STEEL REINFORCED CONCRETE (REINFORCED CONCRETE) PIPELINE SECTIONS | 2009 |
|
RU2422585C2 |
STEEL/FERROCONCRETE UNDERGROUND PIPELINE | 0 |
|
SU1133337A1 |
PENSTOCK FORKED TUBE | 0 |
|
SU1813835A1 |
Authors
Dates
2006-03-27—Published
2004-08-19—Filed