FIELD: construction.
SUBSTANCE: in suggested design of discharge composite reinforced concrete (reinforced concrete) filled water conduits, arranged at slope of soft soils, consisting of separate sections and having a cog in basement part of sections, cog arranged in basement part of each section arranged at top side with ledge having horizontal surface, onto which basement part of end section rests of above-arranged adjacent section, in which the basement part in zone of rest is arranged as horizontal. Horizontal surface of cog ledge is arranged with coating with low indices of shift resistance.
EFFECT: increased operational reliability.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
SEALING OF MOVEMENT JOINT OF STEEL REINFORCED CONCRETE (REINFORCED CONCRETE) PIPELINE SECTIONS | 2009 |
|
RU2422585C2 |
TURBINE WATER CONVEYANCE STRUCTURE | 2004 |
|
RU2275463C2 |
METHOD TO INCREASE RELIABILITY AND DURABILITY OF STEEL REINFORCED CONCRETE TURBINE WATER CONDUIT | 2010 |
|
RU2433222C1 |
RETAINING WALL | 2023 |
|
RU2814227C1 |
WATER CONDUIT WELDING | 0 |
|
SU1723249A1 |
MULTI-TIER AVALANCHE STRUCTURE WITH PROMENADE TERRACES ON SCARP | 2012 |
|
RU2501911C1 |
THREE-DIMENSIONAL FOUNDATION PLATFORM CONNECTED TO TANK TO FORM CLOSED SYSTEM TO BE BUILT ON WEAK, PERMAFROST, HEAVING SOIL AND IN SEISMIC ZONES (VARIANTS) | 2004 |
|
RU2273697C2 |
METHOD FOR PROTECTING TERRITORY FROM FLOODING | 2000 |
|
RU2176700C1 |
CONCRETE DAM ON ROCK FOUNDATION | 2011 |
|
RU2496939C2 |
STEEL/FERROCONCRETE UNDERGROUND PIPELINE | 0 |
|
SU1133337A1 |
Authors
Dates
2011-02-27—Published
2009-07-13—Filed