FIELD: oil production industry, particularly devices included in packing equipment and adapted for packer installation in production wells during well repair operations.
SUBSTANCE: method involves lowering hydraulic jack connected to coiled tubing pipe in well, wherein the lower part of hydraulic jack is fastened to bridge plug by collet unlocking mechanism releasable at predetermined depth; leaving the bridge plug in well for necessary repair work performing; removing hydraulic jack connected to coiled tubing pipe from well. The bridge plug may be released from the well when needed by drilling-out thereof.
EFFECT: increased reliability, simplified packer structure, reduced labor inputs and costs of packer installation.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF FORMATION OF TEMPORARY BARRIER IN FILTER ZONE OF DEVELOPMENT WELL AND EQUALIZATION OF INJECTIVITY PROFILE OF INJECTION WELLS | 2000 |
|
RU2169261C1 |
METHOD OF TREATMENT AND DEMUDDING OF BOTTOM-HOLE ZONE OF DEVELOPMENT WELLS | 2000 |
|
RU2172824C1 |
METHOD FOR RESTRICTING BOTTOM WATER AND ANNULUS BLOWOUTS IN PRODUCTION WELLS | 2000 |
|
RU2172825C1 |
CHEMICAL ADDITIVE FOR MEASURES TAKEN IN OPERATION OF OIL AND GAS WELLS | 2000 |
|
RU2174179C1 |
EQUALIZER TO COMPENSATE DYNAMIC LOADS ACTING ON RODS | 2004 |
|
RU2273715C2 |
SEALING COMPOSITION | 2004 |
|
RU2270227C1 |
METHOD OF DELIVERING EQUIPMENT AT COILED TUBING TO SPECIFIED INTERVAL OF MULTIHOLE PRODUCTION WELL AND DEVICE FOR ITS IMPLEMENTATION | 2010 |
|
RU2449107C2 |
METHOD AND DEVICE FOR CONTROLLED PUMPING DOWN TO FORMATIONS | 2012 |
|
RU2495235C1 |
PROCEDURE FOR ISOLATING OPERATIONS IN WELL AND PACKER EQUIPMENT | 2010 |
|
RU2414586C1 |
MULTI-BOTTOMHOLE DESIGN FOR PRODUCTION IN PERMAFROST AREAS | 2008 |
|
RU2379496C1 |
Authors
Dates
2006-04-10—Published
2004-04-15—Filed