METHOD OF DELIVERING EQUIPMENT AT COILED TUBING TO SPECIFIED INTERVAL OF MULTIHOLE PRODUCTION WELL AND DEVICE FOR ITS IMPLEMENTATION Russian patent published in 2012 - IPC E21B23/00 E21B47/01 

Abstract RU 2449107 C2

FIELD: oil and gas industry.

SUBSTANCE: group of inventions relates to oil and gas producing industry, namely to the method of equipment delivery to the specified interval of multi-hole well and device for its implementation. In the course of method implementation the deflectors oriented from the well mouth are installed at the column of tubing, the equipment is lowered to the specified interval of the well and is delivered from column of tubing to the side hole in condition of closed access to the tubing interval located below or the equipment is lowered to the tubing column interval located below in condition of closed access to the side hole. The deflector installed at tubing is used as device. Deflector consists of hollow rotating housing equipped with lateral window and guiding element that provides coiled tubing passing to the side hole of the well or tubing interval located below.

EFFECT: due to the elimination of necessity to draw tubing column in advance the treatment and geophysical researches performance in multi-branch wells is simplified.

4 cl, 5 dwg

Similar patents RU2449107C2

Title Year Author Number
METHOD FOR CONSTRUCTION OF MULTI-HOLE WELL IN UNSTABLE RESERVOIRS 2024
  • Fursin Sergei Georgievich
  • Gneush Vladislav Sergeevich
  • Al-Idrisi Mokhammed Salekh Abdullakh Khaled
RU2825795C1
ORIENTATOR OF FLEXIBLE PIPE 2007
  • Galaj Mikhail Ivanovich
  • Demjanenko Nikolaj Aleksandrovich
  • Gruzdilovich Leonid Mikhajlovich
  • Sushko Vladimir Aleksandrovich
RU2355862C2
DEVICE FOR GUIDANCE AND DELIVERY OF FLEXIBLE PIPE IN SIDE WELLBORE 2015
RU2612181C2
METHOD TO INCREASE FORMATION HYDROCARBON YIELD AND INTENSIFY OIL-GAS-CONDENSATE PRODUCTION BY MEANS OF FORMATION RADIAL PENETRATION WITH HYDRAULIC MONITOR AT PRESSURE DRAWDOWN 2016
  • Popov Pavel Ivanovich
RU2632836C1
SEALING METHOD OF CONNECTION OF MAIN AND SUPPLEMENTARY BORE HOLES 2010
  • Fatkullin Rashad Khasanovich
  • Khisamov Rais Salikhovich
  • Kadyrov Ramzis Rakhimovich
  • Zhirkeev Aleksandr Sergeevich
  • Garifov Kamil' Mansurovich
RU2455466C1
WATER INFLUX INTERVAL SHUTOFF DEVICE IN OPEN HOLE OF HORIZONTALLY-BRANCHED WELL 2013
  • Amerkhanov Marat Inkilapovich
  • Beregovoj Anton Nikolaevich
  • Novikov Igor' Mikhajlovich
  • Makhmutov Il'Gizar Khasimovich
  • Zijatdinov Radik Zjauzjatovich
RU2534118C1
METHOD OF INCREASING OIL RECOVERY OF FORMATIONS AND INTENSIFICATION OF OIL PRODUCTION AND SYSTEM FOR ITS IMPLEMENTATION 2019
  • Krivoshchekov Sergej Nikolaevich
  • Kochnev Aleksandr Aleksandrovich
  • Vyatkin Kirill Andreevich
RU2703064C1
ORIENTATOR OF FLEXIBLE PIPE 2009
  • Rodionov Vjacheslav Ivanovich
  • Demjanenko Nikolaj Aleksandrovich
  • Chajka Valerij Pavlovich
  • Pysenkov Viktor Gennad'Evich
  • Serebrennikov Anton Valer'Evich
  • Semenkov Vasilij Sergeevich
  • Tret'Jakov Dmitrij Leonidovich
RU2398949C1
METHOD FOR COMPLETING A WELL IN DIFFICULT CONDITIONS 2023
  • Fursin Sergei Georgievich
  • Al-Idrisi Mokhammed Salekh
RU2806388C1
PROCEDURE FOR DEVELOPMENT OF HIGH VISCOUS OIL DEPOSITS 2008
  • Abdulmazitov Rafil' Ginijatullovich
  • Ramazanov Rashit Gaznavievich
  • Strakhov Dmitrij Vital'Evich
  • Zijatdinov Radik Zjauzjatovich
  • Osnos Vladimir Borisovich
  • Asadullin Marat Fagimovich
RU2363839C1

RU 2 449 107 C2

Authors

Galaj Mikhail Ivanovich

Demjanenko Nikolaj Aleksandrovich

Dates

2012-04-27Published

2010-07-01Filed