FIELD: oil and gas well operation, particularly methods or devices for cementing, for plugging holes, crevices, or the like.
SUBSTANCE: method involves injecting plugging composition in reservoir; washing out excessive plugging composition from string space by reverse back-pressure flushing thereof. Gel-forming compositions filterable in reservoir are serially supplied in reservoir along with following restrengthening thereof with hardening composition, namely synthetic resin or cement solution, which can be absorbed or nonabsorbed by reservoir. Back-pressure during excessive reservoir-absorbable plugging composition removal is 0.6-0.9 of final plugging composition pressure during forcing it into reservoir. Back-pressure during excessive reservoir-nonabsorbable plugging composition removal is 0.9-1.0 of final plugging composition pressure during forcing it into reservoir. Pressure of plugging composition hardening in isolation zone is 0.1-0.5 of final plugging composition pressure during forcing it into reservoir.
EFFECT: increased isolation work quality.
4 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF INSULATING WORKS IN PRODUCTION WELL | 2009 |
|
RU2389865C1 |
ISOLATION METHOD OF WATER INFLUXES TO WELL | 2013 |
|
RU2520190C1 |
RESTORING METHOD OF SEALING OF CASING STRINGS | 2011 |
|
RU2471963C1 |
ISOLATION METHOD FOR BOREHOLE ANNULUS CIRCULATION OF SUPERIOR NON PERFORATED AQUIFER IN DOWNSTREAM PERFORATED OIL-BEARING LAYER | 2015 |
|
RU2584256C1 |
METHOD FOR ELIMINATING FLOWS BEHIND THE CASING IN PETROLEUM PRODUCTION BOREHOLES | 2021 |
|
RU2774251C1 |
METHOD FOR PRODUCTION WELL REPAIR | 2005 |
|
RU2322569C2 |
METHOD OF TREATMENT OF INJECTION WELLS | 1998 |
|
RU2131022C1 |
WELL REPAIR METHOD | 2011 |
|
RU2483193C1 |
INSULATION METHOD FOR BEHIND-THE-CASING FLOWS IN PRODUCTION WELL | 2020 |
|
RU2739181C1 |
WELL REPAIR METHOD | 2011 |
|
RU2484234C1 |
Authors
Dates
2006-04-10—Published
2004-06-07—Filed