FIELD: oil and gas industry.
SUBSTANCE: at the first step there pumped to punched holes of productive formation is cement grouting in the volume required for insulation of channel of overflow between gas- or water-bearing formations and overlapping of oil formation. Special holes are made in the area of bottom of interval of gas-bearing formation and/or area of bottom or top of interval of water-bearing formation. Gel-forming compound is pumped to the above special holes, and after that making-up is performed.
EFFECT: increasing efficiency of insulation works in well owing to preventing gel-forming compound from penetration into productive formation and owing to simplifying the development of productive formation.
4 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ELIMINATING ANNULAR CIRCULATION | 2023 |
|
RU2808347C1 |
WELL REPAIR METHOD | 2011 |
|
RU2483193C1 |
METHOD FOR RESTORING TIGHTNESS OF PRODUCTION STRINGS | 1997 |
|
RU2116432C1 |
METHOD OF ISOLATION OF WATER SUPPLY IN OIL-EXTRACTING WELL | 2017 |
|
RU2655495C1 |
METHOD OF REPAIR-INSULATION WORKS IN OIL AND GAS WELL | 2019 |
|
RU2723416C1 |
WELL REPAIR METHOD | 2011 |
|
RU2484234C1 |
METHOD FOR ISOLATION WORK PERFORMING IN WELL | 2004 |
|
RU2273723C2 |
CASING ANNULUS PLUGGING METHOD | 2005 |
|
RU2286438C1 |
METHOD OF ELIMINATION OF LOWER BOREHOLE ANNULUS CIRCULATION IN WELL | 2007 |
|
RU2340760C1 |
METHOD FOR REMEDIAL CEMENTING WORKS PERFORMING AFTER HYDRAULIC FORMATION FRACTURING | 2004 |
|
RU2278243C2 |
Authors
Dates
2010-05-20—Published
2009-04-07—Filed