FIELD: methods of surface mining, particularly for following natural stone treatment by covering or impregnating thereof with liquid or other flowable substances on surface.
SUBSTANCE: method involves gunning salt pit surface with waterproofing agent; covering salt pile surface with clay-and-salt mud layer in dry and hot season after salt pile hardening in at least 1.0-1.5 months after pile filling with salt. The clay-and-salt mud is sylvinite ore-dressing waste obtained from chemical factory. The clay-and-salt mud layer has 10-20 mm thickness and is formed by gunning salt pile surface with above mud material. The clay-and-salt mud is supplied into pneumatic pump receiver, wherein solid/liquid phase ratio is 1:2 - 1:3.
EFFECT: increased efficiency of salt pile waterproofing.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR TECHNICAL RECLAMATION OF SALT SLOPE | 2022 |
|
RU2797254C1 |
METHOD OF MAKING POTASSIUM CHLORIDE | 2011 |
|
RU2473393C1 |
PROCEDURE OF SALT DUMP ELIMINATION AT POTASSIUM MINES | 2007 |
|
RU2355887C1 |
METHOD FOR RECLAIMING SLOPES SALT DUMPS | 2014 |
|
RU2584711C1 |
METHOD FOR PILING POTASSIUM ORE TAILINGS | 0 |
|
SU1716131A1 |
METHOD OF FORMING SALT DUMPS | 0 |
|
SU1270332A1 |
METHOD FOR DISCHARGE OF SALT DISPOSAL WASTE DURING ITS RECULTIVATION | 2023 |
|
RU2797225C1 |
METHOD OF DEPOSITING WASTE OF CONCENTRATION MILLS OF POTASSIUM WORKS | 0 |
|
SU994727A1 |
METHOD TO STORE RUN-OFF OF INDUSTRIAL PLANTS WITH VARIOUS FILTRATION PROPERTIES | 2007 |
|
RU2349396C1 |
METHOD FOR ARRANGEMENT OF POTASSIUM PLANTS DRESSING WORKS WASTES | 2009 |
|
RU2402682C1 |
Authors
Dates
2006-04-10—Published
2004-07-23—Filed