FIELD: mining.
SUBSTANCE: method includes arrangement of brine-impermeable screen, formation of dump and erection of contour bund from salt wastes, with further arrangement of reservoirs on it, being separated by dams from salt wastes, where slurries are placed, area of salt dump is divided into plots by radial dams, which are erected in process of salt dump inwash. At the same time two adjacent plots are simultaneously in operation, on one of them salt wastes are arranged, and on the other one reservoirs are formed from salt wastes by erection of transverse banks, which are filled with slurries, and further thus all plots of salt dump are filled in a layer, and the second and further layers of wastes on salt dump are formed with alternation of plots for arrangement of salt wastes with plots for location of slurries, at the same time alternation of plots in layers is done in horizontal and vertical planes.
EFFECT: stocking liquid and solid dressing wastes at the same site, and reduction of area for slurry tank.
3 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR FORMING SLOPE OF SALT DUMP IN COMBINED STORAGE OF WASTES IN ENRICHMENT FACTORIES OF POTASH PLANTS | 2015 |
|
RU2594498C1 |
METHOD OF DEPOSITING WASTE OF CONCENTRATION MILLS OF POTASSIUM WORKS | 0 |
|
SU994727A1 |
METHOD OF SLUDGE DUMP LOCATION ON THE TERRITORY OF FUTURE SALT DUMPS | 2015 |
|
RU2597237C1 |
METHOD OF FORMING DUMP | 2016 |
|
RU2667395C2 |
METHOD OF HYDRAULIC FILLING OF TAILING DUMP FROM WATER-SOLUBLE WASTES | 2000 |
|
RU2194162C2 |
METHOD TO STORE RUN-OFF OF INDUSTRIAL PLANTS WITH VARIOUS FILTRATION PROPERTIES | 2007 |
|
RU2349396C1 |
METHOD FOR SALT DUMP AND MUD PIT CONSTRICTION IN SINGLE AREA | 2006 |
|
RU2316651C1 |
METHOD OF DUMPING OF POTASSIUM ORE CONCENTRATION WASTES ON SOFT BASE | 2001 |
|
RU2204717C1 |
METHOD OF DISPOSAL OF CONCENTRATION WASTE IN POTASSIUM INDUSTRY | 0 |
|
SU1355709A1 |
METHOD OF FORMING SALT DUMPS | 0 |
|
SU1270332A1 |
Authors
Dates
2010-10-27—Published
2009-07-22—Filed