FIELD: mining, particularly potassium plants, namely for waste salt and mud storage.
SUBSTANCE: method involves constructing front slope with inclination angle less than that of waste salt solution in area adapted for salt dump construction, wherein the front slope extends from boundary, which separates salt dump and mud pit; forming upper salt dump part as front slope reaches height exceeding height of brine leakage from salt dump at the highest mud pit filling degree so that upper salt dump part extends at angle equal to natural solid waste salt slope.
EFFECT: increased salt dump capacity and provision of safe inwashing conditions, decreased volume of works necessary for mud pit dam construction.
4 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SLUDGE DUMP LOCATION ON THE TERRITORY OF FUTURE SALT DUMPS | 2015 |
|
RU2597237C1 |
METHOD OF DUMPING OF POTASSIUM ORE CONCENTRATION WASTES ON SOFT BASE | 2001 |
|
RU2204717C1 |
METHOD TO STORE RUN-OFF OF INDUSTRIAL PLANTS WITH VARIOUS FILTRATION PROPERTIES | 2007 |
|
RU2349396C1 |
METHOD FOR ARRANGEMENT OF POTASSIUM PLANTS DRESSING WORKS WASTES | 2009 |
|
RU2402682C1 |
METHOD OF FORMING DUMP | 2016 |
|
RU2667395C2 |
METHOD FOR FORMING SLOPE OF SALT DUMP IN COMBINED STORAGE OF WASTES IN ENRICHMENT FACTORIES OF POTASH PLANTS | 2015 |
|
RU2594498C1 |
METHOD FOR PILING POTASSIUM ORE TAILINGS | 0 |
|
SU1716131A1 |
METHOD OF HYDRAULIC FILLING OF TAILING DUMP FROM WATER-SOLUBLE WASTES | 2000 |
|
RU2194162C2 |
METHOD OF DISPOSAL OF CONCENTRATION WASTE IN POTASSIUM INDUSTRY | 0 |
|
SU1355709A1 |
METHOD OF DEPOSITING WASTE OF CONCENTRATION MILLS OF POTASSIUM WORKS | 0 |
|
SU994727A1 |
Authors
Dates
2008-02-10—Published
2006-07-05—Filed