FIELD: drilling and blasting operations in hard rocks, applicable in various branches using blasting operations in rock masses.
SUBSTANCE: the method includes determination of the strength characteristics of rocks in power intensity of drilling of rocks and calculation on their base of the power intensity of explosive destruction of rocks. According to the invention, blasts are performed on rock samples with standard structures of charges in compliance with standard blast plans with a repeated determination of the strength characteristics of rocks on the remaining sections of the sample after blasting of each stage of delay, the coefficients of variation of the strength characteristics of rocks caused by the action of the blast of the previous stages of delay for each standard blast plan are calculated, and these coefficients are used in calculation of the power intensity of rock destruction of each stage of delay of the working blocks for similar conditions.
EFFECT: sufficiently simplified appraisal of variation of the properties of the mass of each subsequent stage of delay caused by the action of earlier blasted charges; enhanced accuracy of determination of the power intensity of explosive destruction of rocks due to allowance made for variation of the strength properties of rocks by blasts of the previous holes.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DETERMINING DIMENSIONS OF A PRE-DESTRUCTION ZONE IN A ROCK MASS | 2019 |
|
RU2723418C1 |
OPTIMAL ES CHARGE DETERMINING METHOD TAKING INTO ACCOUNT OF THE PRE-DESTRUCTION ZONE | 2018 |
|
RU2677727C1 |
METHOD OF EXPLOSIVE ROCKS DESTRUCTION OPTIMAL PARAMETERS DETERMINING TAKING INTO ACCOUNT OF THE PRE-DESTRUCTION ZONE | 2017 |
|
RU2655009C1 |
METHOD FOR DETERMINATION OF OPTIMAL PARAMETERS OF EXPLOSIVE DESTRUCTION OF ROCKS | 2004 |
|
RU2275587C1 |
METHOD OF EXECUTION OF BLASTING OPERATIONS | 1997 |
|
RU2116612C1 |
BLASTING METHOD TAKING INTO ACCOUNT PRE-DESTRUCTION ZONE | 2018 |
|
RU2698391C1 |
METHOD FOR BREAKING ROCKS BY BLASTING AND DEVICE FOR ITS REALIZATION | 1992 |
|
RU2039253C1 |
METHOD OF THE MULTI-ROW BLASTING OF THE BOREHOLE CHARGES AND THE DEVICE FOR THE METHOD REALIZATION | 2004 |
|
RU2291388C2 |
OPEN DEVELOPMENT METHOD OF COAL BEDS GROUP WITH GROSS EXPLOSIVE LOOSENING OF OVERBURDEN ROCKS | 2015 |
|
RU2593285C1 |
METHOD OF DEVELOPMENT OF LOCAL AREAS OF MINERALIZATION IN STRONG ROCKS | 2019 |
|
RU2723419C1 |
Authors
Dates
2006-04-27—Published
2004-10-22—Filed