FIELD: building, particularly pile foundations erected in weak bearing or karst ground.
SUBSTANCE: method involves driving pile provided with tip in lower part thereof in ground up to design mark by pile rotation; carrying excavated ground to day surface and supplying concrete mix to pile base; driving hollow pile in ground by pile rotation, wherein the hollow pile is pipe having orifices in wall thereof; filling pile interior with concrete mix for height equal to 3-5 pile pipe diameters from pile tip; applying pressure to concrete mix to displace the mix towards ground hole wall to create concrete base.
EFFECT: increased load-bearing capacity of the piles.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
BORED PILE AND METHOD FOR PILE ERECTION IN KARST OR SOFT GROUND | 2004 |
|
RU2270294C1 |
PROCESS OF ERECTION OF PILE IN GROUND | 2001 |
|
RU2208089C2 |
PROCESS OF ERECTION OF GUARDING ANTIFILTRATION ENGINEERINGPRTECTIVE STRUCTURE | 2001 |
|
RU2206663C1 |
TECHNIQUE TO ERECT ANTIFILTRATION ENGINEERING-PROTECTIVE STRUCTURE | 2001 |
|
RU2211283C1 |
PROCESS OF ERECTION OF PILE IN GROUND | 2001 |
|
RU2208088C2 |
PILE | 2001 |
|
RU2204653C2 |
METHOD FOR SHEET-PILE ENCLOSURE OR RETAINING WALL FORMING WITH GROUND WATER FLOW CONTROL | 2004 |
|
RU2283921C2 |
PILE AND METHOD OF ITS ERECTION | 2013 |
|
RU2528331C1 |
METHOD OF ARRANGING PILE FOUNDATIONS WITH WIDENING BY METHOD OF CRUSHING | 2015 |
|
RU2620112C1 |
METHOD OF ARRANGEMENT OF DRIVEN PILE IN A WELL WITH AN EXTENDED BASE | 2018 |
|
RU2678172C1 |
Authors
Dates
2006-05-10—Published
2004-09-08—Filed