FIELD: oil and gas well building, particularly to perform isolation works in cased wells.
SUBSTANCE: method involves depositing sand column, which closes perforation interval; injecting plugging composition above sand column. The plugging composition comprises aqueous dispersion including fresh water and water-swelling polymeric powder based on water-absorbing polymer. The polymeric powder is taken in amount of 1.5 parts by weight per 100 parts of fresh water. Gel aggregates of water-swelling polymer are added in amount of not more than 5% by fresh water weight.
EFFECT: improved technology of bridge creation.
1 tbl
Title | Year | Author | Number |
---|---|---|---|
INSTALLATION METHOD OF BRIDGE CUTTING OFF BELOW-LYING OIL FORMATION | 2012 |
|
RU2494227C1 |
METHOD OF ELIMINATION OF LOWER BOREHOLE ANNULUS CIRCULATION IN WELL | 2007 |
|
RU2340760C1 |
METHOD OF ELIMINATION OF LEAKAGE OF PRODUCING WELL COLUMN | 2007 |
|
RU2340761C1 |
METHOD FOR LIQUIDATING COMPLICATIONS IN WELLS | 2002 |
|
RU2241818C2 |
INSTALLATION METHOD OF CEMENT BRIDGE IN WELL | 2011 |
|
RU2469178C1 |
METHOD FOR PREVENTION OF BOTTOM WATER INFLUX TO PRODUCING OIL WELL | 2016 |
|
RU2620684C1 |
METHOD OF INSULATING WORKS IN PRODUCTION WELL | 2009 |
|
RU2389865C1 |
METHOD OF OIL WELL DEVELOPMENT (VERSIONS) | 2014 |
|
RU2558069C1 |
WELL REPAIR METHOD | 2011 |
|
RU2483193C1 |
METHOD FOR WATER INFLUX ISOLATION IN HORIZONTAL PRODUCING WELL BORES | 2004 |
|
RU2286448C2 |
Authors
Dates
2006-05-10—Published
2004-07-15—Filed