FIELD: production of seamless hot rolled tubes of forged or continuously cast billets, electroslag refining ingots.
SUBSTANCE: method comprises steps of heating billets or ingots up to yielding temperature; piercing them to hollow sleeves in skew rolling mills; putting sleeve onto mandrel provided with ring; deforming it while feeding at preset speed to deformation zone; rolling out pilger head on free mandrel at rolling away sleeve-tube by means of rolls and simultaneously extracting mandrel by means of feed device; performing last deformation of pilger head before extraction of mandrel from incompletely rolled sleeve-tube; contracting sleeve-tube by means of mandrel ring; applying effort for extracting mandrel by means of feed device at time moment of after-rolling sleeve and rolling out pilger head; extracting mandrel from sleeve-tube while applying effort for extracting mandrel by means of feed device after guiding and rolling tube by length (1.5 - 2.0)Lra where Lra - rolling away path of feed device.
EFFECT: complete after-rolling of pilger heads on free mandrel, lowered factor of metal consumption, enhanced efficiency of aggregate.
4 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR HOT ROLLING OF TUBES OF FORGED BLANKS AND INGOTS (PRODUCED BY CONTINUOUS CASTING, ELECTRIC SLAG REFINING, VACUUM REFINING) IN LINES WITH PILGER ROLLING MILLS | 2001 |
|
RU2207201C2 |
METHOD FOR PRODUCING HOT ROLLED CONVERSION LARGE- AND MEAN-DIAMETER TUBES OF HARD-TO-FORM STEELS AND ALLOYS IN TUBE ROLLING PLANTS WITH PILGER MILLS | 2004 |
|
RU2278750C2 |
METHOD FOR PRODUCTION OF SEAMLESS HOT-DEFORMED BOILER THICK-WALLED PIPES WITH SIZE OF 465×75 mm IN PIPE-ROLLING PLANTS WITH PILGER MILLS FOR PIPELINES OF HEAT COAL BLOCKS WITH SUPERCRITICAL STEAM PARAMETRES | 2006 |
|
RU2386502C2 |
PRODUCTION OF 465×75 MM SEAMLESS HOT-ROLLED PIPES FOR STEAM BOILERS, STEAM PIPELINES AND MANIFOLDS OF PLANTS WITH HIGH AND SUPERHIGH STEAM PARAMETERS FROM ESR INGOTS OF "10Х9МФБ-Ш"-GRADE STEEL | 2012 |
|
RU2527587C2 |
METHOD FOR MAKING TUBES OF HARD-TO-FORM KINDS OF STEELS AND ALLOYS WITH INCREASED LINEAR EXPANSION FACTOR | 2002 |
|
RU2221656C2 |
METHOD OF PRODUCTION OF SEAMLESS HOT-ROLLED LARGE- AND MEDIUM-DIAMETER PIPES FROM STEEL AND ALLOYS AT PIPE ROLLING PLANTS WITH PILGRIM MILLS FROM TUBULAR BLANKS | 2012 |
|
RU2502570C1 |
PRODUCTION OF 426×90 MM SEAMLESS HOT-ROLLED PIPES FOR STEAM BOILERS, STEAM PIPELINES AND MANIFOLDS OF PLANTS WITH HIGH AND SUPERHIGH STEAM PARAMETERS OF "10Х9МФБ-Ш"-GRADE STEEL AT PRU 8-16'' WITH PILGER MILLS | 2013 |
|
RU2537639C1 |
PRODUCTION OF 550×25-30 mm SEAMLESS HOT-ROLLED PIPES FOR STEAM BOILERS, STEAM PIPELINES AND MANIFOLDS OF PLANTS WITH HIGH AND SUPERHIGH STEAM PARAMETERS OF "10Х9МФБ-Ш"-GRADE STEEL | 2014 |
|
RU2570152C2 |
PRODUCTION OF COMMERCIAL AND REROLLED PIPES AT PRU WITH PILGER MILLS FROM FORGED OR HOLLOWS ESR INGOTS-BILLETS FROM ALLOYED HARDLY-DEFORMED STEELS AND ALLOYS AND TITANIUM-BASED STEELS | 2013 |
|
RU2542156C2 |
METHOD OF CONVERSION PIPE MANUFACTURING IN PIPE ROLLING PLANTS WITH PILGER MILLS OF LOW-ELASTICITY STEEL WITH BORON CONTENT OF 1,3-1,8% | 2006 |
|
RU2334571C2 |
Authors
Dates
2006-05-20—Published
2004-07-14—Filed