FIELD: crushing or grinding materials.
SUBSTANCE: complex comprises crushing installation provided with input and output chutes and mounted at 50° to horizontal plane on the bearing-foundation frame. The discharging transporter for transmitting the crushed mass to the intermediate transporter underlies the outlet chute of the crushing installation. The device for separating iron is mounted at the end of the discharging transporter. The side transporter underlies the discharging end of the intermediate transporter and is used for feeding the crushed mass to the screen where it is divided into three fractions and enters the hopper provided with three sections. The complex has the second crushing installation for crushed mass that does not pass through the screen and moves down under the action of vibration of the screen to the receiving chute of the second crushing installation and further through the outlet chute of the second crushing installation enters the return transporter and through the side transporter again to the vibration screen.
EFFECT: enhanced efficiency.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
UNIT FOR PROCESSING OF REINFORCED CONCRETE STRUCTURES | 2014 |
|
RU2565183C2 |
COMPLEX OF RECYCLING OF RAILWAY WOODEN SLEEPERS ALONG WITH PRODUCTION OF HEAT POWER AND WITH LINES OF PRODUCTION OF SAWDUST CONCRETE AND WOOD-FILLED PLASTIC MATERIALS | 2008 |
|
RU2373001C1 |
REPROCESSING METHOD OF METALLURGICAL SLAGS AND PROCESS LINE (VERSIONS) FOR ITS IMPLEMENTATION | 2008 |
|
RU2377324C2 |
MOBILE MACHINE FOR RECEIVING, CLEANING AND PLACING CRUSHED-STONE BALLAST | 0 |
|
SU1512491A3 |
METHOD FOR PRODUCTION OF RECULTIVATION CONSTRUCTION INERT MATERIAL | 2021 |
|
RU2764413C1 |
0 |
|
SU121650A1 | |
UNIT FOR DESTROYING OF CONSTRUCTION INDUSTRY WASTES | 2003 |
|
RU2234377C1 |
HOPPER-BATCHER | 1994 |
|
RU2100512C1 |
DEVICE FOR RECOVERING BALLAST LAYER BASE OF RAILWAY TRACK | 1995 |
|
RU2106451C1 |
VEHICLE SANITARY COMPLEX | 2001 |
|
RU2176965C1 |
Authors
Dates
2006-06-27—Published
2005-07-22—Filed