BRIDGE SPAN STRUCTURE Russian patent published in 2006 - IPC E01D2/00 E01D12/00 

Abstract RU 2280122 C1

FIELD: building, particularly to erect small-scale and medium-scale bridges over rivers, rail roads, overpasses, to construct span sections of overpasses, trestles and floor structures.

SUBSTANCE: span structure comprises main metallic tubular beams and metal arch-shaped shells installed between the tubular beams and connected to them, as well as reinforced concrete section connected to main beams by means of thrust members. Main tubular beams are united in at least two mounting units. Each unit comprises at least two spaced apart main tubular beams so that distance between tubular beams is equal to tubular beam diameter. The tubular beams are connected with each other by arch-shaped shell formed of tube half having diameter equal to tubular beam diameter. Mounting units are connected with each other by two overlapped arch-shaped connection members extending along main beam sides and forming arch-shaped shells made as tube halves. The arch-shaped connection members have arch lengths exceeding quarter of tubular beam perimeter. Tension bars are installed in each tubular beam. Transversal ties are arranged in each arch-shaped shell so that transversal ties and tension bars are arranged in horizontal planes and spaced apart along unit length and connected with each other in cross-section to create integral transversal links in the unit. Stiffening members with central orifices are located inside each main beam in thrust parts thereof. Besides, each mounting unit has rod-like thrusts welded to upper mounting unit surface in staggered order so that the thrusts are transversal to above surface. Reinforced concrete section is solid.

EFFECT: simplified structure, reduced time of bridge erection in difficult-to-access areas.

2 cl, 5 dwg

Similar patents RU2280122C1

Title Year Author Number
BRIDGE SPAN STRUCTURE ERECTION METHOD 2005
  • Pichugov Igor' Anatol'Evich
  • Bystrov Vladimir Apollinar'Evich
  • Blagovidov Il'Ja Igorevich
RU2280121C1
METHOD OF BRIDGE SPAN ASSEMBLY 2008
  • Gur'Janov Jurij Aleksandrovich
  • Pshenichnikov Stanislav Konstantinovich
  • Dankovtsev Aleksandr Fedorovich
  • Kotov Valerij Anatol'Evich
RU2385982C1
SPAN STRUCTURE OF BRIDGE 2019
  • Paryshev Dmitrij Nikolaevich
  • Iltyakov Aleksandr Vladimirovich
  • Kopyrin Vladimir Ivanovich
  • Moiseev Oleg Yurevich
  • Mosin Aleksej Aleksandrovich
  • Ovchinnikov Igor Georgievich
  • Ovchinnikov Ilya Igorevich
  • Kharin Valerij Vasilevich
  • Popov Igor Pavlovich
  • Kharin Aleksej Valerevich
  • Voronkin Vladimir Aleksandrovich
RU2720906C1
SPAN STRUCTURE 0
  • Bystrov Vladimir Appolinarevich
  • Novozhilova Natalya Ivanovna
  • Agapov Nikolaj Petrovich
SU831893A1
BUILT-UP BRIDGE BEAM AND BRIDGE ROAD 1995
  • Dmitriev V.I.
RU2100523C1
STEEL-FERROCONCRETE BRIDGE SPAN STRUCTURE 0
  • Bystrov Vladimir Appolinarevich
  • Novozhilova Natalya Ivanovna
  • Budnyatskij Mark Danielevich
SU1276734A1
0
  • Syrkov Anton Vladimirovich
  • Bystrov Vladimir Ipolinarevich
SU1779703A1
TUBE-CONCRETE PRESTRESSED BEAM 2016
  • Moiseev Oleg Yurevich
  • Paryshev Dmitrij Nikolaevich
  • Ovchinnikov Igor Georgievich
  • Kopyrin Vladimir Ivanovich
  • Kharin Valerij Vasilevich
  • Ovchinnikov Ilya Igorevich
RU2632798C1
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE 2023
  • Bellendir Evgenij Nikolaevich
  • Illarionov Aleksandr Gennadevich
  • Budarin Aleksandr Mikhajlovich
  • Rempel Georgij Igorevich
  • Butovka Aleksej Nikolaevich
  • Kretov Dmitrij Aleksandrovich
RU2815705C1
HYBRID BRIDGE SPAN 2022
  • Ivanov Artem Nikolaevich
  • Nedobezhkin Ivan Viktorovich
  • Pinyazhin Sergej Viktorovich
  • Saushkin Vasilij Vasilevich
RU2794115C1

RU 2 280 122 C1

Authors

Pichugov Igor' Anatol'Evich

Bystrov Vladimir Apollinar'Evich

Blagovidov Il'Ja Igorevich

Dates

2006-07-20Published

2005-06-16Filed