FIELD: automatic control of underground reservoir construction in soluble sedimentary rock, particularly underground liquid or gaseous hydrocarbon deposit constriction and underground industrial and radioactive waste storage.
SUBSTANCE: device comprises automatic measuring system for brine parameters determination. The measuring system comprises measuring unit with sensors to be installed directly in brine line and recording unit. Device also includes multi-channel receiving converter for information gathering and control unit, as well as ultrasound sensors linked to flowmeter. Information gathering unit output is associated with PC.
EFFECT: possibility of device usage for several underground reservoirs construction, extended range of technological parameters to be controlled during reservoir construction and increased accuracy of brine concentration determination.
2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR SIMULTANEOUS DEVELOPMENT OF UNDERGROUND RESERVOIRS GROUP IN SOLUBLE ROCKS | 2009 |
|
RU2399571C9 |
METHOD OF TIGHTNESS TESTING FOR UNDERGROUND RESERVOIR ARRANGED IN SOLUBLE ROCKS THROUGH DRILL WELL | 2010 |
|
RU2439517C1 |
METHOD OF SALT HYDRAULIC BOREHOLE MINING AND DEVICE FOR ITS EMBODIMENT | 1994 |
|
RU2078212C1 |
METHOD FOR CONSTRUCTION OF UNDERGROUND VESSEL IN DEPOSITS OF ROCK SALT | 1997 |
|
RU2118606C1 |
PROCEDURE FOR INCREASING PAYLOAD VOLUME OF UNDERGROUND RESERVOIR FORMED IN SOLUBLE ROCK VIA BORE WELL | 2007 |
|
RU2384505C2 |
METHOD OF PREPARING IODINATED COMMON SALT | 1999 |
|
RU2179147C2 |
METHOD OF FORMING RESERVOIRS IN ROCK SALT FORMATIONS AND DEVICE TO THIS END | 2011 |
|
RU2477702C2 |
METHOD OF CREATING UNDERGROUND STORAGE IN SOLUBLE ROCKS | 2004 |
|
RU2256596C1 |
METHOD OF REPAIR OF WELLS OF UNDERGROUND STORAGE TANKS | 2001 |
|
RU2211300C1 |
WELL CLUSTER PRODUCTIVITY DETERMINING SYSTEM | 2006 |
|
RU2338873C2 |
Authors
Dates
2006-08-10—Published
2001-12-27—Filed