BORED CAST-IN-PLACE STEPPED FOUNDATION AND ERECTION METHOD Russian patent published in 2006 - IPC E02D27/01 

Abstract RU 2286424 C1

FIELD: building, particularly to erect bored cast-in-place foundations of increased load-bearing abilities including ones having bottom marks typical to shallow foundations.

SUBSTANCE: stepped foundation comprises bored cast-in-place sections formed with the use of auger. Lower foundation step includes four peripheral cylinders of Dp.l. diameters and heights equal to above diameters. Peripheral cylinder centers are located at apexes of square having side lengths equal to Dp.l.. Square center coincides with center of support. Central support abutting four peripheral cylinders of lower foundation step has four expanded parts with Dc.exp diameters determined as Dc.exp=(1.0-1.2)Dp.l. and cylindrical bore having diameter Dp.up determined as Dp.up=(0.6-0.8)Dp.l.. Foundation bottom is 0.7 m below ground surface. Foundation erection method involves forming drilled pile sections; serially drilling wells having daug.1 diameters as each peripheral cylinder having Dp.l. is forming; creating each peripheral cylinder having height equal to Dp.l. by supplying working material for above cylinder forming; filling remainder well section with ground material, particularly with ground excavated from above object. Auger having diameter, which provides necessary Dp.l. diameter is used. The auger provides usage of technological processes, which provides 1.05-1.1 increase of pile diameter in comparison with auger diameter daug.1 and 1.1-1.2 increase of ground pile diameter in comparison with daug.1 diameter. After four peripheral cylinders of lower foundation step creation well having daug.2 diameter is drilled by means of direct auger rotation and ground excavation to day surface. The well has center coinciding with central support center and depth selected so that the well reach tops pf peripheral lower step cylinders. Then lower expanded part of central support is formed, wherein the expanded part has expansion degree Bc.exp./daug.2 equal to 1.5-2.0. During cylindrical bore drilling the expanded part has expansion degree Dp.up/daug.2 equal to 1.2-1.5.

EFFECT: increased load-bearing capacity per foundation volume unit, extended field of technical means.

3 cl, 4 dwg

Similar patents RU2286424C1

Title Year Author Number
METHOD FOR ERECTION OF BORED PILE WITH SOIL-CEMENT BROADENINGS IN WEAK SOILS ZONE AND DEVICE FOR ITS IMPLEMENTATION (VERSIONS) 2019
  • Mikhajlov Aleksandr Nikolaevich
  • Pushkarev Aleksandr Evgenevich
  • Sokolov Nikolaj Sergeevich
  • Sokolov Sergej Nikolaevich
  • Sokolov Andrej Nikolaevich
  • Savchuk Aleksandr Dmitrievich
RU2725363C1
DRILL STRING FOR ERECTION OF BORED PILE IN SOIL-CEMENT CLADDING 2019
  • Mikhajlov Aleksandr Nikolaevich
  • Pushkarev Aleksandr Evgenevich
  • Sokolov Nikolaj Sergeevich
  • Sokolov Sergej Nikolaevich
  • Sokolov Andrej Nikolaevich
RU2735077C1
METHOD FOR ERECTION OF BORED PILE IN SOIL-CEMENT COATING 2019
  • Sokolov Nikolaj Sergeevich
  • Mikhajlov Aleksandr Nikolaevich
  • Pushkarev Aleksandr Evgenevich
  • Sokolov Sergej Nikolaevich
  • Sokolov Andrej Nikolaevich
RU2720047C1
DRILLING METHOD TO ERECT STRIP FOUNDATION IN WATER-BEARING SOILS 2010
  • Ponomarenko Jurij Viktorovich
  • Mel'Nikova Ljudmila Petrovna
  • Moskovchenko Galina Jur'Evna
RU2415228C1
PIPE CONCRETE PILE WITH REINFORCED BASE AND METHOD OF ITS ERECTION 2011
  • Akatov Vjacheslav Pavlovich
  • Akatov Maksim Vjacheslavovich
  • Dankovtsev Aleksandr Fedorovich
  • Pudeev Pavel Vasil'Evich
  • Smirnov Aleksandr Jur'Evich
  • Politiko Dmitrij Leonidovich
  • Fedorashko Nikolaj Vasil'Evich
RU2492294C1
SCREW PILE 2014
  • Zubekhin Sergej Alekseevich
RU2564714C1
METHOD OF CONSTRUCTING CAST-IN-PLACE PILES 0
  • Vilchinskij Grigorij Yakovlevich
SU903473A1
ERECTION METHOD OF DRIVEN PILE 2014
  • Mal'Tsev Nikolaj Vasil'Evich
RU2560027C1
METHOD FOR BORED INJECTION PILE ERECTION 2003
  • Grin'Ko S.G.
  • Kovalev S.V.
  • Kozakov Ju.N.
  • Bulankin N.F.
RU2260093C2
GROUND ANCHOR OR DRILLING PILE AND MANUFACTURING METHOD OF GROUND ANCHOR OR DRILLING PILE 2013
  • Eremin Valerij Jakovlevich
  • Molchanov Kirill Dmitrievich
  • Siguta Jurij Vasil'Evich
  • Fedorovskij Viktor Grigor'Evich
RU2543842C1

RU 2 286 424 C1

Authors

Stoljarov Viktor Gavrilovich

Dates

2006-10-27Published

2005-05-05Filed