FIELD: building, particularly for pile erection in civil and industrial building.
SUBSTANCE: method involves drilling hole; installing injection pipe in the hole; reinforcing thereof with reinforcement frame; concreting pile body and injecting reinforcement grout through injection pipe. Hole reinforcing is carried out simultaneously with installation of reinforcement frame having injection pipe connected thereto. Grout pumping is carried out by supplying pulsing flow under lower pile end when pile body is not hardened.
EFFECT: reduced cost and labor inputs for injection pile erection.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ERECTION OF ARMCO PILE-INJECTOR | 2006 |
|
RU2332540C2 |
METHOD FOR ERECTION OF BORED PILE | 2007 |
|
RU2364683C2 |
METHOD TO ERECT COMBINED PILE AND ITS DESIGN | 2011 |
|
RU2486315C2 |
ERECTION METHOD OF PILE FOUNDATION FOR REINFORCEMENT | 2015 |
|
RU2603314C1 |
METHOD FOR INJECTION PILE BUILDING (VARIANTS) | 2004 |
|
RU2263745C1 |
METHOD OF INJECTION PILE BUILDING | 2003 |
|
RU2238366C1 |
METHOD FOR BORED AND CAST-IN-PLACE PILE FORMING ALONG WITH GROUND COMPACTION AT HOLE BOTTOM | 2003 |
|
RU2260654C1 |
METHOD FOR MANUFACTURING A WIDENED CAST-IN-PLACE PILE | 2022 |
|
RU2795418C1 |
METHOD FOR CONSTRUCTING DRILLED PILE IN PERMAFROST SOIL | 2023 |
|
RU2803751C1 |
INJECTION PILE AND THE METHOD FOR ITS INSTALLATION | 2021 |
|
RU2771363C1 |
Authors
Dates
2005-09-10—Published
2003-04-29—Filed