FIELD: mining industry, possible use for reclamation of damaged lands in agriculture, power-construction industrial branches.
SUBSTANCE: method includes, after extraction of quarry field is finished, closure of each quarry by reinforced structures made in form of sleeves of geo-synthetic material and filled with milled construction wastes, while ends of sleeves are sewn shut. Reinforced structures are placed one after another, closely to each other. On top of reinforced structures, draining layer is filled, then a layer of stripping rocks and finally a layer of potentially fertile soil with following seeding thereof with perennial grasses, brushes and trees.
EFFECT: decreased laboriousness and costs of restorative operations.
3 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR WORKED-OUT PIT RECLAMATION | 2006 |
|
RU2310755C1 |
METHOD FOR LAND RECLAMATION IN THE CASE OF LAND CORRUPTION BY OPENED DEPOSIT DEVELOPMENT | 2005 |
|
RU2274750C1 |
RESTORATION METHOD OF DISTURBED LANDS AT OPEN DEVELOPMENT OF DEPOSITS OF MINERAL RESOURCES | 2010 |
|
RU2444628C1 |
METHOD FOR LAND RECLAMATION IN THE CASE OF LAND CORRUPTION BY OPENED DEPOSIT DEVELOPMENT | 2005 |
|
RU2274749C1 |
METHOD OF RECONSTRUCTION OF BARROW PITS FOR BUILDING OF CEMETERY | 2016 |
|
RU2654906C2 |
RECOVERY METHOD OF MINED-OUT PITS FOR CONSTRUCTION OF CEMETERY | 2015 |
|
RU2611749C1 |
METHOD FOR RECLAMATION OF WORKED-OUT PITS | 2010 |
|
RU2442896C1 |
METHOD TO RESTORE ABANDONED PITS FOR CONSTRUCTION OF CEMETERY | 2013 |
|
RU2529037C1 |
METHOD OF RECOVERING BARROW PITS FOR COSTRUCTING VARIOUS STRUCTURES | 2007 |
|
RU2354830C1 |
METHOD FOR RECOVERY OF EXHAUSTED OPEN PITS FOR CONSTRUCTION OF STRUCTURES | 2009 |
|
RU2387837C1 |
Authors
Dates
2006-12-20—Published
2006-01-27—Filed