FIELD: mining and processing industry, particularly to reclaim soil in agriculture and building and power engineering industries.
SUBSTANCE: method involves performing selective mining, conveying and stacking ground layer and overburden in separate strip dumps; developing pit field; filling exhausted space with building waste in several layers along with rolling of each building waste layer; leveling thereof with overburden and laying ground layer. Pit is filled with building waste up to mid-height pit level, but not under ground water level. After that building waste is rolled and covered with overburden for total pit filling. Then overburden layer is leveled. To prevent ground settlement wells are formed along filled pit surface, wherein the wells are formed up to design depth and are filled with building waste with each building waste portion compaction. Overburden layer, building waste layer, reinforced structure level formed of geo-synthetic sleeves filled with building waste milled to obtain particle dimensions of not more than 150 mm are serially laid on filled pit.
EFFECT: decreased labor inputs and costs.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR RECLAIMING TERRITORIES DAMAGED BY OPEN EXTRACTION OF DEPOSITS | 2006 |
|
RU2289695C1 |
METHOD FOR LAND RECLAMATION IN THE CASE OF LAND CORRUPTION BY OPENED DEPOSIT DEVELOPMENT | 2005 |
|
RU2274750C1 |
METHOD FOR LAND RECLAMATION IN THE CASE OF LAND CORRUPTION BY OPENED DEPOSIT DEVELOPMENT | 2005 |
|
RU2274749C1 |
METHOD OF RECOVERING BARROW PITS FOR COSTRUCTING VARIOUS STRUCTURES | 2007 |
|
RU2354830C1 |
METHOD FOR RECOVERY OF EXHAUSTED OPEN PITS FOR CONSTRUCTION OF STRUCTURES | 2009 |
|
RU2387837C1 |
RESTORATION METHOD OF DISTURBED LANDS AT OPEN DEVELOPMENT OF DEPOSITS OF MINERAL RESOURCES | 2010 |
|
RU2444628C1 |
METHOD OF RECONSTRUCTION OF BARROW PITS FOR BUILDING OF CEMETERY | 2016 |
|
RU2654906C2 |
RECOVERY METHOD OF MINED-OUT PITS FOR CONSTRUCTION OF CEMETERY | 2015 |
|
RU2611749C1 |
METHOD FOR RESTORATION OF BARROW PITS FOR CONSTRUCTION OF STRUCTURES | 2008 |
|
RU2381365C1 |
METHOD FOR RECLAMATION OF WORKED-OUT PITS | 2010 |
|
RU2442896C1 |
Authors
Dates
2007-11-20—Published
2006-11-21—Filed