METHOD FOR EXTRACTING OIL DEPOSIT Russian patent published in 2006 - IPC E21B43/20 

Abstract RU 2290499 C1

FIELD: oil industry, possible use for extracting oil deposit, characterized by proximity of bed pressure to pressure of oil saturation with gas in ceiling section and substantial difference between these characteristics in contour-adjacent section of deposit.

SUBSTANCE: in accordance to method, working agent is fed through force wells, oil is extracted through product wells and operation of product wells is maintained in modes with face pressure not lower than 0,75 of pressure value of oil saturation with gas. Dependencies between saturation value and depth, and formation value and depth are built and rules are determined concerning changes of saturation pressure and formation pressure along absolute depth of formation. Wells are positioned in circular or rectilinear rows in plane, repeating iso-lines characterizing rules of change of saturation pressure in deposit. Face pressures in product wells are set at level not less than 75% of actual saturation pressure, taking place in deposit at absolute mark of product wells face. Extraction of ceiling-adjacent section is performed with more intensive forcing of working agent into force wells.

EFFECT: increased current extraction and better oil extraction due to optimized modes of operation of product and force wells due to adaptation to properties of deposit, determining its extractive capabilities.

1 ex, 3 tbl, 3 dwg

Similar patents RU2290499C1

Title Year Author Number
METHOD FOR EXTRACTING MULTI-BED OIL DEPOSIT 2006
  • Lejbin Ehmmanuil L'Vovich
  • Lisovskij Nikolaj Nikolaevich
  • Sharifullin Farid Abdullovich
  • Akhapkin Mikhail Jur'Evich
  • Epishin Viktor Dmitrievich
RU2290493C1
METHOD FOR EXTRACTING AN OIL POOL 2006
  • Lejbin Ehmmanuil L'Vovich
  • Akhapkin Mikhail Jur'Evich
  • Epishin Viktor Dmitrievich
  • Velichkina Nadezhda Fedorovna
RU2290501C1
METHOD FOR EXTRACTING WATERED OIL DEPOSIT AT LATER STAGE BY MEANS OF GAS-HYDRODYNAMIC INFLUENCE 2003
  • Lejbin Eh.L.
  • Sharifullin F.A.
  • Zanichkovskij F.M.
  • Maksutov R.A.
RU2236573C1
OIL POOL DEVELOPMENT METHOD BASED ON SYSTEM DETECTION OF WELLS FLOODED WITH EXTRANEOUS WATER, THEIR REPAIR AND PUTTING ON PRODUCTION 2002
  • Epishin V.D.
  • Lejbin Eh.L.
  • Sentjurev A.V.
  • Sharifullin F.A.
RU2214505C1
METHOD OF DEVELOPMENT OF OIL POOL 1998
  • Lejbin Eh.L.
  • Sharifullin F.A.
  • Kuz'Min V.M.
  • Bokserman A.A.
  • Shaevskij O.Ju.
  • Turbanov V.N.
RU2143547C1
METHOD FOR OIL RESERVOIR DEVELOPMENT AT LATER STAGE BY WATER-GAS HYDRODYNAMIC ACTION DURING PERIODICAL GASEOUS PHASE DISPERSION CHANGE 2006
  • Lejbin Ehmmanuil L'Vovich
  • Sharifullin Farid Abdulovich
  • Zanichkovskij Feliks Mikhajlovich
  • Maksutov Ravkhat Akhmetovich
RU2318997C1
DEVELOPMENT METHOD OF TIGHT OIL RESERVOIRS BY CYCLIC PUMPING OF CARBON DIOXIDE 2016
  • Akhmetgareev Vadim Valerevich
  • Khisamov Rais Salikhovich
  • Podavalov Vladlen Borisovich
RU2630318C1
METHOD FOR DEVELOPING A LOW-PERMEABILITY RESERVOIR OF AN OIL DEPOSIT 2022
  • Iakupov Aidar Rashitovich
RU2783464C1
METHOD FOR DEVELOPING OIL-WATER ZONE OF OIL FIELD 2023
  • Iakupov Aidar Rashitovich
RU2804051C1
METHOD OF DEVELOPING LOW PERMEABLE RESERVOIR BY PERIODIC INJECTION OF CARBON DIOXIDE GAS 2016
  • Akhmetgareev Vadim Valerevich
  • Khisamov Rais Salikhovich
  • Podavalov Vladlen Borisovich
RU2627336C1

RU 2 290 499 C1

Authors

Lejbin Ehmmanuil L'Vovich

Sharifullin Farid Abdullovich

Akhapkin Mikhail Jur'Evich

Epishin Viktor Dmitrievich

Dates

2006-12-27Published

2006-03-09Filed