FIELD: construction, particularly to protect existent objects near construction site.
SUBSTANCE: method involves forming geotechnical screen in ground, wherein the geotechnical screen is made by driving injectors in ground between foundations of existent objects and objects to be erected and injecting consolidation solution in ground under pressure. The geotechnical screen is composite and formed with the use of injectors grouped in two rows, namely in passive and active ones. The passive injector row is located from side of object to be erected. The active injector row is installed from side of existent object. Consolidation solution is initially supplied to passive injector row by single solution injection in ground and then in active injector row by repeated solution injection in ground to obtain initial deflected mode of existent object base and foundation ground.
EFFECT: reduced negative influence of geotechnical screen on filler structures of objects to be erected, increased efficiency and reliability of object protection in densely built-up areas.
4 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF EXISTING BUILDINGS AND CONSTRUCTIONS PROTECTION | 2006 |
|
RU2328577C2 |
METHOD FOR SAFE UNDERMINING OF GROUND OBJECTS BY AN UNDERGROUND STRUCTURE IN COMPLEX ENGINEERING-GEOLOGICAL CONDITIONS | 2018 |
|
RU2685607C1 |
METHOD FOR ERECTION OF COMPREHENSIVE DEVELOPMENT BUILDING | 2008 |
|
RU2391464C2 |
METHOD OF UNDERGROUND STRUCTURE ERECTION IN URBAN BUILT-UP AREA | 2002 |
|
RU2245966C2 |
METHOD OF CORRECTION OF SUBSIDENCE TROUGH AT ERECTION OF UNDERGROUND STRUCTURE BY CLOSED METHOD IN WEAK SOILS | 2019 |
|
RU2715784C1 |
METHOD FOR DEPTH COMPENSATION COMPACTION OF SOIL | 2009 |
|
RU2405890C1 |
METHOD TO MAINTAIN INITIAL STRESSED-DEFORMED CONDITION OF SOIL IN ZONE OF EXISTING BUILDING FOUNDATION | 2010 |
|
RU2422592C1 |
METHOD FOR REDUCING SETTLEMENT OF BUILDINGS DURING CONSTRUCTION OF UNDERGROUND WORKINGS UNDER THEM | 2020 |
|
RU2749003C1 |
METHOD OF UNDERGROUND STRUCTURE ERECTION IN URBAN BUILT-UP AREA | 2002 |
|
RU2245428C2 |
METHOD FOR INJECTION FIXATION AND REINFORCEMENT OF BASES OF FOUNDATIONS OF DEFORMED AND RECONSTRUCTED BUILDINGS AND STRUCTURES, CARRIED OUT BY IMPREGNATING WATER-SATURATED SOILS USING LOW-VISCOSITY HIGH-PENETRATING GELLING HARDENING SOLUTION BASED ON SILICA SOL AND ORGANOSILICON COMPOSITIONS | 2024 |
|
RU2824786C1 |
Authors
Dates
2007-01-10—Published
2005-06-30—Filed