FIELD: construction, particularly to erect new houses and reconstruct existent subsurface buildings and underground structures.
SUBSTANCE: structural combined member includes reinforced concrete panel 1 and reinforcing member 4. Diaphragm wall is composed of upper 14 and lower 10 sections in wall height direction. Reinforced concrete panel 1 is installed from pit 19 side and connected to reinforcing member 4 by means of connection rods and embedded members 2. Diaphragm wall is made of alternating composite members having different configuration. Lower wall side is formed of soil-concrete by hardening mortar injection in composite member parts of upper wall section through vertical channels.
EFFECT: reduced metal consumption.
26 cl, 10 dwg
Title | Year | Author | Number |
---|---|---|---|
WALL IN GROUND | 2003 |
|
RU2252986C1 |
STRUCTURAL UNIT FOR COMPOSITE DIAPHRAGM WALL CONSTRUCTION AND COMPOSITE DIAPHRAGM WALL | 2006 |
|
RU2292422C1 |
METHOD TO ERECT UNDERGROUND STRUCTURES BY "WALL IN SOIL" METHOD AND WALL IN SOIL ERECTED BY THIS METHOD | 2011 |
|
RU2465401C1 |
PILE | 1996 |
|
RU2091540C1 |
BUILT-UP MEMBER OF PREFABRICATED-MONOLITHIC WALL IN GROUND | 2003 |
|
RU2220255C1 |
PROCESS OF ERECTION OF MULTILEVEL UNDERGROUND STRUCTURE ( VARIANTS ) | 2003 |
|
RU2220258C1 |
DIAPHRAGM WALL | 2005 |
|
RU2288324C1 |
DIAPHRAGM WALL | 2005 |
|
RU2288323C1 |
PREFABRICATED REINFORCED-CONCRETE WALL IN GROUND AND METHOD OF ITS ERECTION | 1997 |
|
RU2119992C1 |
METHOD FOR ERECTION OF DISMOUNTABLE ASSEMBLED WALL IN SOIL | 1993 |
|
RU2046883C1 |
Authors
Dates
2007-01-20—Published
2005-06-28—Filed