FIELD: civil engineering. SUBSTANCE: dismountable assembled wall in soil is driven in passes. One standard assembled member without extended crosswise reinforcement, and at least one assembled member with extended crosswise reinforcement are used in each pass. Length of the extended reinforcement exceeds half length between assembled members. Assembled member without extended reinforcement is installed in tail of each pass. Soil development in the following pass, and installation of appropriate assembled members are carried out before concreting monolithic section adjoining the last assembled member in the pass. Then the last assembled member in the previous pass is withdrawn, and an assembled member with extended reinforcement is installed on this position. Then wall monolithic sections adjoining this member, and wall monolithic sections between assembled members with extended reinforcement are concreted, and standard assembled member is used in the following passes. EFFECT: high speed of erection. 6 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF ERECTION OF MULTILEVEL UNDERGROUND STRUCTURE ( VARIANTS ) | 2003 |
|
RU2220258C1 |
BUILT-UP MEMBER OF PREFABRICATED-MONOLITHIC WALL IN GROUND | 2003 |
|
RU2220255C1 |
WALL IN GROUND | 2003 |
|
RU2252986C1 |
STRUCTURAL UNIT FOR COMPOSITE DIAPHRAGM WALL CONSTRUCTION AND COMPOSITE DIAPHRAGM WALL | 2006 |
|
RU2292422C1 |
PILE FOR COMPOSITE WALL BUILT IN GROUND | 2003 |
|
RU2233944C1 |
CAST-IN-PLACE AND PRECAST "WALL IN SOIL" BASED ON REINFORCED CONCRETE T-BAR ELEMENTS (VERSIONS) | 2007 |
|
RU2354779C1 |
METHOD FOR ERECTION OF UNDERGROUND STRUCTURE | 1999 |
|
RU2138597C1 |
PILE FOR COMPOSITE WALL BUILT IN GROUND | 2003 |
|
RU2233943C1 |
UNDERGROUND STRUCTURE AND METHOD OF CONSTRUCTION OF UNDERGROUND STRUCTURE | 1983 |
|
RU2091542C1 |
METHOD FOR ERECTION AND RECONSTRUCTION OF BUILDINGS AND PRODUCTION OF ARTICLES FROM COMPOSITE MATERIALS MAINLY OF CONCRETE FOR ABOVE PURPOSES | 1996 |
|
RU2107783C1 |
Authors
Dates
1995-10-27—Published
1993-08-23—Filed