FIELD: construction, particularly working measures on existing buildings.
SUBSTANCE: method involves installing rectangular load-bearing frame between building ends; erecting one or more stories over the frame, where each story is made of rectangular building modules having door and window openings; perforating door openings in building ends so that the door openings mate ones of building modules.
EFFECT: increased flat areas along with reduced time and costs.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD AND KIT TO ERECT INSERTED STRUCTURE BETWEEN TWO EXISTENT BUILDINGS | 2005 |
|
RU2292434C1 |
BUILDING RECONSTRUCTION METHOD | 2003 |
|
RU2256046C1 |
SWIMMING POOL FOR ENCLOSED SPACE | 2005 |
|
RU2298620C1 |
MULTISTORY PASSENGER CAR GARAGE MODULE | 2005 |
|
RU2305741C2 |
METHOD FOR INSTALLATION OF METAL DOOR ASSEMBLY | 2006 |
|
RU2324043C2 |
DEVICE FOR BUILDING ERECTION | 2003 |
|
RU2253721C1 |
DWELLING BUILDING WITH ADDED STRUCTURES | 1996 |
|
RU2112850C1 |
METAL DOOR | 2006 |
|
RU2317392C1 |
DEVICE FOR INCREASING NUMBER OF BUILDING STORIES | 2003 |
|
RU2253722C1 |
METHOD FOR CONSTRUCTING BUILDING ADDITION | 2010 |
|
RU2442868C1 |
Authors
Dates
2007-02-20—Published
2005-07-20—Filed