FIELD: oil industry, particularly methods or devices for cementing, for plugging holes, crevices, or the like.
SUBSTANCE: method involves drilling well up to design depth; lowering production string provided with glass-fiber pipe; locating the glass-fiber pipe opposite to producing formation; cementing well. Glass-fiber pipe having wall with thickness 10-15% smaller than that of production string wall is used as insert between metal pipes of production string. During producing formation exposing the glass-fiber insert is removed by applying mechanical action thereto. Cement stone and adjacent rock layer are also removed behind the glass-fiber insert.
EFFECT: increased producing ability.
1 ex
Title | Year | Author | Number |
---|---|---|---|
WELL CONSTRUCTION METHOD | 2005 |
|
RU2295628C1 |
WELL CONSTRUCTION METHOD | 2019 |
|
RU2726667C1 |
METHOD FOR CONSTRUCTION OF WELL FOR MULTIBED OIL DEPOSIT | 2003 |
|
RU2235854C1 |
METHOD OF CONSTRUCTING WELL OF MULTILAYER OIL FIELD | 1999 |
|
RU2161239C1 |
METHOD OF OIL DEPOSIT DEVELOPMENT | 2008 |
|
RU2369724C1 |
METHOD OF COMPLETING AND OPERATION OF WELL OF UNDERGROUND GAS STORAGES | 2018 |
|
RU2686259C1 |
COMPLETION METHOD FOR A PRODUCTION WELL THAT HAS OPENED A TRANSITIONAL ZONE OF A GAS DEPOSIT | 2022 |
|
RU2793351C1 |
METHOD FOR WELL CONSTRUCTION | 1991 |
|
RU2012777C1 |
PROCEDURE FOR DEVELOPMENT OF HIGH VISCOUS OIL DEPOSITS | 2008 |
|
RU2363839C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL DEPOSITS | 2008 |
|
RU2398104C2 |
Authors
Dates
2007-03-20—Published
2005-10-04—Filed