COMPLETION METHOD FOR A PRODUCTION WELL THAT HAS OPENED A TRANSITIONAL ZONE OF A GAS DEPOSIT Russian patent published in 2023 - IPC E21B33/14 E21B43/00 

Abstract RU 2793351 C1

FIELD: gas industry.

SUBSTANCE: invention relates to the gas industry, and in particular to a method for completing a production well that has opened a transitional zone of a gas deposit. The method of completing a production well that has opened a transitional zone of a gas deposit includes drilling a well for a conductor, lowering a casing string; carrying out works on cementing in the outer annulus, followed by waiting for the cement to harden; drilling a well for the production casing with the opening of the productive formation to the full thickness; descent of the production string; cementing and waiting for the cement to harden, flushing the well with a solution of calcium chloride, drilling out the packer, pumping hydrochloric acid into the under-packer space and destroying fusible inserts, developing and bringing to operation. In the proposed method, a well is drilled under a production casing with opening of a productive gas-saturated formation with a transition zone for the entire thickness with drilling fluid, running a production casing equipped with a staged cementing sleeve and an annular collar cementing packer, with overlapping the entire thickness of the productive gas-saturated formation with a transition zone. Annular packer for collar cementing is installed in the interval of the roof of a productive gas-saturated formation with a transition zone. Next, the well is flushed by replacing the drilling fluid in the wellbore with a 3% solution of calcium chloride CaCl2, cementing the production string through the staged cementing sleeve, when the cement hardens a cutter assembly is used for drilling out the annular collar cementing packer of on a 3% aqueous solution of calcium chloride CaCl2, flushing the well with a 3% aqueous solution of calcium chloride CaCl2, pumping 20% hydrochloric acid HCl into the under-packer space with the destruction of fusible inserts, lowering the drill string with a mechanical packer and forcing into the pore structure of the reservoir with a transition zone of the composition based on hydrophobic organosilicon fluids and ethyl esters of orthosilicic acid, resulting in the formation of a water-proof screen in a productive formation with a transition zone, the lower part of which, upon contact with ethyl esters of orthosilicic acid with water, becomes impermeable to water, and the upper part is carried out into the reservoir important during its commissioning, then the downhole equipment is lowered and the formation is developed by the method of reducing the density of the liquid and bringing it to the gas production mode.

EFFECT: development of the effective method for completing a production well that has opened the transition zone of a gas deposit.

1 cl, 7 dwg

Similar patents RU2793351C1

Title Year Author Number
METHOD OF CONDUCTING WATER-INSULATING WORKS IN THE EXTRACTING WELL, EXCLUDING THE WATER OIL DEPOSIT 2017
  • Leontev Dmitrij Sergeevich
  • Kleshchenko Ivan Ivanovich
  • Leonteva Natalya Alekseevna
  • Ponomarev Andrej Aleksandrovich
  • Aleksandrov Vadim Mikhajlovich
RU2661935C1
PROCEDURE FOR COMPLETION OF STRIPPER WELL 2015
  • Vaganov Yurij Vladimirovich
  • Kustyshev Aleksandr Vasilevich
  • Yagafarov Alik Kayumovich
  • Gagarina Oksana Valerievna
RU2586337C1
METHOD OF PRODUCTIVE RESERVOIR OPENING 2018
  • Salikhov Ajrat Dufarovich
  • Emelyanov Vitalij Vladimirovich
  • Idiyatullina Zarina Salavatovna
RU2723813C2
METHOD OF PREVENTING WATER FLOW IN WELL DEVELOPED OIL IN WATER RESERVOIR 2017
  • Leontev Dmitrij Sergeevich
  • Kleshchenko Ivan Ivanovich
  • Leonteva Natalya Alekseevna
  • Vaganov Yurij Vladimirovich
  • Semenenko Anastasiya Fedorovna
  • Baluev Anatolij Andreevich
RU2665769C1
COMPLETION METHOD OF HORIZONTAL WELL 2014
  • Ibragimov Nail' Gabdulbarievich
  • Rakhmanov Ajrat Rafkatovich
  • Asljamov Ajrat Ingelevich
  • Garaev Rafaehl' Rasimovich
  • Sinchugov Nikolaj Sergeevich
RU2541979C1
COMPLETION METHOD FOR WELL WITH HORIZONTAL SHAFT 2014
  • Ibragimov Nail' Gadbulbarievich
  • Taziev Mirgazijan Zakievich
  • Rakhmanov Ajrat Rafkatovich
  • Asljamov Ajrat Ingelevich
  • Asljamov Ajdar Ingelevich
RU2541981C1
WELL COMPLETION METHOD 2023
  • Zaripov Ildar Mukhamatullovich
  • Iskhakov Albert Ravilevich
RU2795281C1
METHOD FOR COMPLETION OF HORIZONTAL WELL OF SMALL DIAMETER 2012
  • Ibragimov Nail' Gabdulbarievich
  • Taziev Mirgazijan Zakievich
  • Rakhmanov Ajrat Rafkatovich
  • Asljamov Ajrat Ingelevich
  • Osipov Roman Mikhajlovich
  • Sinchugov Nikolaj Sergeevich
  • Garaev Rafaehl' Rasimovich
RU2490426C1
WELL COMPLETION METHOD AND DEVICE FOR ITS IMPLEMENTATION 2023
  • Zaripov Ildar Mukhamatullovich
  • Iskhakov Albert Ravilevich
RU2798540C1
WELL COMPLETION METHOD 2020
  • Bakirov Daniyar Lyabipovich
  • Burdyga Vitalij Aleksandrovich
  • Fattakhov Marsel Masalimovich
  • Gritsaj Grigorij Nikolaevich
  • Antonov Vasilij Vladimirovich
RU2757383C1

RU 2 793 351 C1

Authors

Leontev Dmitrij Sergeevich

Vaganov Yurij Vladimirovich

Ovchinnikov Vasilij Pavlovich

Dates

2023-03-31Published

2022-07-18Filed