FIELD: oil industry, particularly methods or devices for cementing, for plugging holes, crevices, or the like.
SUBSTANCE: method involves drilling well up to design depth; lowering production string provided with glass-fiber liner; cementing well. Glass-fiber liner with closed lower end having wall thickness 10-15% smaller than that of production string wall is used. Packer is arranged over glass-fiber liner. Coupling with orifices is located over the packer. Production string is inserted in well so that the coupling is opposite to upper producing formation level. Then packer is installed. Well cementing is carried out by forcing cement via production string, through coupling orifices and hole annuity up to well head. Then the well is left as it is up for cement hardening, glass-fiber liner is drilled and well is completed.
EFFECT: increased producing ability.
1 ex
Title | Year | Author | Number |
---|---|---|---|
WELL CONSTRUCTION METHOD | 2019 |
|
RU2726667C1 |
WELL CONSTRUCTION METHOD | 2005 |
|
RU2295627C1 |
COMPLETION METHOD OF HORIZONTAL WELL | 2014 |
|
RU2541979C1 |
METHOD FOR COMPLETION OF HORIZONTAL WELL OF SMALL DIAMETER | 2012 |
|
RU2490426C1 |
COMPLETION METHOD FOR WELL WITH HORIZONTAL SHAFT | 2014 |
|
RU2541981C1 |
METHOD FOR CONSTRUCTION OF WELL FOR MULTIBED OIL DEPOSIT | 2003 |
|
RU2235854C1 |
COMPLETION METHOD FOR A PRODUCTION WELL THAT HAS OPENED A TRANSITIONAL ZONE OF A GAS DEPOSIT | 2022 |
|
RU2793351C1 |
COMPLETION METHOD FOR WELL WITH HORIZONTAL SHAFT | 2014 |
|
RU2541980C1 |
METHOD OF CONSTRUCTING WELL OF MULTILAYER OIL FIELD | 1999 |
|
RU2161239C1 |
METHOD OF HORIZONTAL OIL WELL CONSTRUCTION | 2013 |
|
RU2520033C1 |
Authors
Dates
2007-03-20—Published
2005-10-04—Filed