WELL CONSTRUCTION METHOD Russian patent published in 2007 - IPC E21B33/14 

Abstract RU 2295628 C1

FIELD: oil industry, particularly methods or devices for cementing, for plugging holes, crevices, or the like.

SUBSTANCE: method involves drilling well up to design depth; lowering production string provided with glass-fiber liner; cementing well. Glass-fiber liner with closed lower end having wall thickness 10-15% smaller than that of production string wall is used. Packer is arranged over glass-fiber liner. Coupling with orifices is located over the packer. Production string is inserted in well so that the coupling is opposite to upper producing formation level. Then packer is installed. Well cementing is carried out by forcing cement via production string, through coupling orifices and hole annuity up to well head. Then the well is left as it is up for cement hardening, glass-fiber liner is drilled and well is completed.

EFFECT: increased producing ability.

1 ex

Similar patents RU2295628C1

Title Year Author Number
WELL CONSTRUCTION METHOD 2019
  • Abakumov Anton Vladimirovich
RU2726667C1
WELL CONSTRUCTION METHOD 2005
  • Ibragimov Nail' Gabdulbarievich
  • Sharikov Gennadij Nesterovich
  • Kormishin Evgenij Grigor'Evich
  • Isakov Vladimir Sergeevich
RU2295627C1
COMPLETION METHOD OF HORIZONTAL WELL 2014
  • Ibragimov Nail' Gabdulbarievich
  • Rakhmanov Ajrat Rafkatovich
  • Asljamov Ajrat Ingelevich
  • Garaev Rafaehl' Rasimovich
  • Sinchugov Nikolaj Sergeevich
RU2541979C1
METHOD FOR COMPLETION OF HORIZONTAL WELL OF SMALL DIAMETER 2012
  • Ibragimov Nail' Gabdulbarievich
  • Taziev Mirgazijan Zakievich
  • Rakhmanov Ajrat Rafkatovich
  • Asljamov Ajrat Ingelevich
  • Osipov Roman Mikhajlovich
  • Sinchugov Nikolaj Sergeevich
  • Garaev Rafaehl' Rasimovich
RU2490426C1
COMPLETION METHOD FOR WELL WITH HORIZONTAL SHAFT 2014
  • Ibragimov Nail' Gadbulbarievich
  • Taziev Mirgazijan Zakievich
  • Rakhmanov Ajrat Rafkatovich
  • Asljamov Ajrat Ingelevich
  • Asljamov Ajdar Ingelevich
RU2541981C1
METHOD FOR CONSTRUCTION OF WELL FOR MULTIBED OIL DEPOSIT 2003
  • Ibragimov N.G.
  • Zaljatov M.Sh.
  • Zakirov A.F.
  • Minnullin R.M.
  • Khamidullin A.N.
  • Akhmetshin R.M.
RU2235854C1
COMPLETION METHOD FOR A PRODUCTION WELL THAT HAS OPENED A TRANSITIONAL ZONE OF A GAS DEPOSIT 2022
  • Leontev Dmitrij Sergeevich
  • Vaganov Yurij Vladimirovich
  • Ovchinnikov Vasilij Pavlovich
RU2793351C1
COMPLETION METHOD FOR WELL WITH HORIZONTAL SHAFT 2014
  • Ibragimov Nail' Gabdulbarievich
  • Taziev Mirgazijan Zakievich
  • Rakhmanov Ajrat Rafkatovich
  • Asljamov Ajrat Ingelevich
  • Osipov Roman Mikhajlovich
RU2541980C1
METHOD OF CONSTRUCTING WELL OF MULTILAYER OIL FIELD 1999
  • Minnullin R.M.
  • Zaljatov M.Sh.
  • Bikbulatov R.R.
RU2161239C1
METHOD OF HORIZONTAL OIL WELL CONSTRUCTION 2013
  • Ibragimov Nail' Gabdulbarievich
  • Rakhmanov Ajrat Rafkatovich
  • Minnullin Rashit Mardanovich
  • Faskhutdinov Ruslan Rustjamovich
  • Garaev Rafaehl' Rasimovich
  • Krotkov Igor' Ivanovich
RU2520033C1

RU 2 295 628 C1

Authors

Ibragimov Nail' Gabdulbarievich

Sharikov Gennadij Nesterovich

Kormishin Evgenij Grigor'Evich

Isakov Vladimir Sergeevich

Dates

2007-03-20Published

2005-10-04Filed