FIELD: hydrocarbon production equipment, particularly for simultaneous separate, continuous, serial, periodical or combined fluid production.
SUBSTANCE: plant comprises pump and two packers, which are connected to pipe string and lowered in well. One packer is located over upper formation, another one is arranged between formations. Pump has shell and is installed between the packers or over packer located above upper formation. Packers may be automatically or hydraulically operated and may be provided with cable input means. Shell is fastened to one or both packers. Bypass unit or gas separator or jet ejector for gas discharge is installed between shell and packer.
EFFECT: increased reliability and functional capability of pumping plant and enhanced efficiency of multizone well operation.
10 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
PUMPING BLOCK FOR WELL OPERATION (VARIANTS) | 2004 |
|
RU2300668C2 |
SHARIFOV'S PACKER SYSTEM FOR ISOLATION OF NON-WORK PERFORATION RANGE OR UNTIGHT HOLE SECTION | 2009 |
|
RU2387802C1 |
BOREHOLE PLANT FOR SIMULTANEOUS SEPARATE AND ALTERNATE OPERATION OF SEVERAL FORMATIONS BY SINGLE WELL | 2003 |
|
RU2262586C2 |
METHOD FOR SIMULTANEOUS SEPARATE MULTIPLE-ZONE WELL OPERATION | 2006 |
|
RU2313659C1 |
PUMP PACKER SYSTEM FOR MULTIPLE-ZONE WELL | 2014 |
|
RU2549946C1 |
PACKER SEPARATION DEVICE FOR WELL RESERVOIR OPERATION (VARIANTS) | 2004 |
|
RU2305170C2 |
METHOD FOR CONCURRENT-SEPARATE OPERATION OF SEVERAL BEDS VIA ONE FORCE WELL IN TURNS | 2003 |
|
RU2253009C1 |
MULTI-RESERVOIR WELL SUMULTANIOUS-SEPARATE PRODUCTION METHOD | 2008 |
|
RU2380526C1 |
METHOD OF INVESTIGATION OF LEAKTIGHTNESS OR LEAKINESS OF PACKER SYSTEM AND CEMENT BRIDGE OF WELL | 2011 |
|
RU2475641C1 |
EQUIPMENT FOR MULTI-RESERVOIR WELL SUMULTANIOUS-SEPARATE RECEARCH AND PRODUCTION WITH ELECTIRCAL SUBMERSIBLE PUMP (VERSIONS) | 2008 |
|
RU2380522C1 |
Authors
Dates
2007-03-27—Published
2005-04-27—Filed