FIELD: oil production, particularly methods or apparatus for obtaining oil, gas, water, soluble or meltable materials from multizone wells.
SUBSTANCE: method involves drilling wells in oil deposit in accordance with deposit development way; producing oil by mechanized manner from upper and lower beds and injecting working liquid in beds for the purpose of bed treatment to maintain bed pressure. First of all simultaneous separate oil extraction from beds in single well is carried out to reduce well bottom pressure up to 3-4 MPa. Then some wells drilled in oil deposit are selected to perform simultaneous separate product extraction from one bed and inject liquid in another bed of single well via tube space. To execute above operations the beds are separated with packer and during liquid injection in lower bed well filter within upper bed interval is isolated with packers. The packers are connected to tubing string so that filter is opposite to upper bed for product extraction from above bed. Tube space over upper packer is communicated with that below lower packer through bypass channels.
EFFECT: decreased capital costs of oil deposit development, reduced time, power and labor inputs.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DROWNED OIL POOL DEVELOPMENT | 2000 |
|
RU2173770C1 |
METHOD FOR MULTIZONE OIL RESERVOIR DEVELOPMENT | 2006 |
|
RU2314414C1 |
METHOD OF DEVELOPMENT OF MULTIRESERVOIR OIL DEPOSITS | 2014 |
|
RU2547857C1 |
METHOD FOR OIL DEVELOPMENT WITH HORIZONTAL WELLS | 2014 |
|
RU2539486C1 |
METHOD AND EQUIPMENT TO OPERATE TWO FORMATIONS IN SINGLE WELL | 2004 |
|
RU2296212C2 |
METHOD OF SIMULTANEOUS-SEPARATE DEVELOPMENT OF SEVERAL PRODUCTIVE FORMATIONS AND WELL UNIT FOR METHOD EMBODIMENT | 2001 |
|
RU2211311C2 |
DEVELOPMENT METHOD OF MULTIPLE-ZONE OIL DEPOSIT | 2014 |
|
RU2540715C1 |
DEVELOPMENT METHOD OF LAYER-BY-ZONAL HETEROGENEOUS SUPERVISCOUS OIL OR BITUMEN | 2015 |
|
RU2582529C1 |
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTI LAYER DEPOSIT AND DEVICE FOR REALIZING SAID METHOD | 2014 |
|
RU2594235C2 |
MULTILAYER OIL DEPOSIT DEVELOPMENT METHOD | 2014 |
|
RU2558546C1 |
Authors
Dates
2007-05-20—Published
2004-12-15—Filed