METHOD AND DEVICE TO REDUCE PERFORATOR PRESSURE AFTER EXPLOSION (VARIANTS) Russian patent published in 2007 - IPC E21B43/11 

Abstract RU 2299975 C2

FIELD: methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells.

SUBSTANCE: device in accordance to the first embodiment comprises perforator with at least one explosive charge and pressure reduction means including heat absorbing means for quick explosive gas temperature reduction. In accordance to the second embodiment device has perforator with at least one explosive charge, explosive gas temperature reduction means and molar explosive gas density reduction means. Method involves utilizing perforator including explosive charges, blasting explosive charges and reducing explosive gas pressure near perforator by molar explosive gas density reduction.

EFFECT: improved hydrodynamic communication between reservoir and well bore and increased efficiency of pressure reduction in perforator after explosion.

42 cl, 1 tbl, 11 dwg

Similar patents RU2299975C2

Title Year Author Number
METHOD AND DEVICES TO CREATE TRANSITION PRESSURE CONDITION INSIDE WELL BORE 2005
  • Ratanasirigulchai Vanchai
  • Bermann Lourens A.
  • Martin Ehndrju Dzh.
  • Gudmehn Kennet R.
RU2310067C2
METHOD AND COMPONENT USED WITH EXPLOSIVES 2000
  • Jang Venbo
  • Grouv Brenden M.
  • Bruks Dzhejms E.
  • Uolton Jan S.
  • Kotkhari Manish
  • Bermann Lourens A.
  • Fejjard Al'Fredo
  • Markel Dehniel S.
  • Vorek Uollas E.
  • Tsimmerman Tomas Kh.
  • Shelton Dzhejms F.
RU2258801C2
METHOD AND FACILITY FOR CONTROL OVER UNSTABLE STATE IN WELL BOREHOLE 2003
  • Dzhonson Ehshli B.
  • Bermann Lourens A.
  • Jang Venbo
  • Dornbos Fokko Kh.K.
  • Uolton Jan S.
RU2352769C2
METHOD AND TOOL STRING FOR WELL TREATMENT TO IMPROVE COMMUNICATION BETWEEN RESERVOIR AND WELL BORE (VARIANTS) 2004
  • Bermann Lourens A.
  • Ehjub Dzhozef A.
  • Uolton Jan
  • Venkitaraman Adinatan
  • Chang Frehnk F.
RU2299976C2
METHOD FOR DYNAMIC PRESSURE REGULATION DURING WELL PERFORATION (VARIANTS) 2004
  • Uolton Jan
  • Chang Frehnk F.
RU2300626C2
PROCEDURE FOR INCREASED PRODUCTION OF METHANE FROM COAL BEARING STRATA BY RAPID OXIDATION (VERSIONS) 2007
  • Olsen Tom
RU2427707C2
METHODS, DEVICES AND SYSTEMS OF ELECTRONIC TIME DELAY 2007
  • Prinz Fransua K.
  • Arrell Dzhon A. Ml.
  • Bordzha Ronald S.
  • Slejd Uill'Jam Dzh.
RU2439482C2
FACILITY AND METHODS FOR REMOVING FILTER CAKE FROM UNCASED BOREHOLE OF WELL 2005
  • Chang Frehnk F.
  • Bermann Lourens A.
  • Uolton Iehn S.
  • Chan' Kehn Sehn
RU2360100C2
PROCEDURE FOR FIRING PERFORATION HOLES IN UNDERGROUND FORMATION 2007
  • Zazovskij Aleksandr F.
  • Akhmadikin Vadim
  • Jang Venbo
  • Grouv Brenden M.
RU2411353C2
BOREHOLE PERFORATOR (VERSIONS), AND PERFORATION METHOD 2008
  • Bermann Lourens A.
  • Grouv Brenden M.
RU2501939C2

RU 2 299 975 C2

Authors

Grouv Brenden M.

Bermann Lourens A.

Uolton Jan S.

Nejzl Filip

Verner Ehndrju T.

Dates

2007-05-27Published

2005-04-22Filed