METHOD FOR DYNAMIC PRESSURE REGULATION DURING WELL PERFORATION (VARIANTS) Russian patent published in 2007 - IPC E21B43/11 

Abstract RU 2300626 C2

FIELD: methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells, particularly for pressure regulation during perforation operation execution.

SUBSTANCE: method in accordance with the first embodiment involves determining characteristics of reservoir to be perforated; selecting dynamic pressure change profile on the base of reservoir characteristics; selecting perforation tool; choosing well fluid from reservoir characteristics and selected perforation tool to obtain chosen dynamic pressure change profile with taking into consideration explosive force of charges and perforator volume. Method in accordance with the second embodiment involves filling well with well fluid selected to regulate dynamic pressure change during perforation tool explosion and after perforation tool explosion with taking into consideration explosive force of charges and perforator volume. Well is perforated by perforation tool explosion.

EFFECT: improved fluid communication between well and reservoir.

14 cl, 5 dwg

Similar patents RU2300626C2

Title Year Author Number
METHOD AND TOOL STRING FOR WELL TREATMENT TO IMPROVE COMMUNICATION BETWEEN RESERVOIR AND WELL BORE (VARIANTS) 2004
  • Bermann Lourens A.
  • Ehjub Dzhozef A.
  • Uolton Jan
  • Venkitaraman Adinatan
  • Chang Frehnk F.
RU2299976C2
METHOD AND DEVICES TO CREATE TRANSITION PRESSURE CONDITION INSIDE WELL BORE 2005
  • Ratanasirigulchai Vanchai
  • Bermann Lourens A.
  • Martin Ehndrju Dzh.
  • Gudmehn Kennet R.
RU2310067C2
METHOD AND FACILITY FOR CONTROL OVER UNSTABLE STATE IN WELL BOREHOLE 2003
  • Dzhonson Ehshli B.
  • Bermann Lourens A.
  • Jang Venbo
  • Dornbos Fokko Kh.K.
  • Uolton Jan S.
RU2352769C2
SYSTEM AND METHOD FOR WELL TREATMENT (VERSIONS) 2004
  • Gruv Brenden M.
  • D'Jukhon Mark S.
  • Bermann Lourens A.
  • Dzhouns Klod D.
RU2355881C2
FACILITY AND METHODS FOR REMOVING FILTER CAKE FROM UNCASED BOREHOLE OF WELL 2005
  • Chang Frehnk F.
  • Bermann Lourens A.
  • Uolton Iehn S.
  • Chan' Kehn Sehn
RU2360100C2
ASSEMBLY AND METHOD FOR FLOW INTENSIFICATION BY HYDRAULIC FRACTURING IN SEVERAL ZONES USING INDEPENDENT UNITS IN PIPE SYSTEMS 2011
  • Tolman Rehndi K.
  • Ehntchev Pavlin B.
  • Ankheles Bosa Renso M.
  • Petri Dennis Kh.
  • Sirls Kevin Kh.
  • Ehl'-Rabaa Abdel' Vadud Mokhammed
RU2571460C2
PROCEDURE AND DEVICE FOR INTRAWELL SELECTIVE COMMUNICATION BY MEANS OF FLUID MEDIUM 2007
  • Vesson Dehvid S.
  • Dzhordzh Kevin R.
  • Snajder Filip M.
RU2401936C1
METHOD FOR EFFICIENCY IMPROVEMENT IN INJECTION AND INTENSIFICATION OF OIL AND GAS PRODUCTION 2009
  • Bell Mattkhev Robert George
  • Vesson David S.
  • Klark Natkhan Garret
  • Khardesty Dzhokhn Tkhomas
RU2567877C2
PROCEDURES AND SYSTEM FOR PERFORATING RESERVOIR IN UNDERGROUND WELL 2006
  • Grouv Brenden M.
RU2416022C2
CUMULATIVE CHARGE 2010
  • Khuan Khunfa
  • Grouv Brenden M.
  • Nejzl Filip
RU2557281C2

RU 2 300 626 C2

Authors

Uolton Jan

Chang Frehnk F.

Dates

2007-06-10Published

2004-11-03Filed