FIELD: heat power engineering.
SUBSTANCE: sprinkler comprises vertical corrugates sheets that are interconnected and provided with cut corrugations. The sides of the corrugations are provided with projections and hollows. The sides of the corrugations are vertical. The projections and hollows are arranged in alternating rows. Each projection or hollow is positioned at an angle of 30 to 45 to the vertical line. The height of each projection and depth of each hollow range from 0.05 to 0.2 of the width of the side. The length of each projection and each hollow is 0.25-0.8 of the width of the side.
EFFECT: enhanced reliability.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
COOLING TOWER SPRINKLER UNIT | 2017 |
|
RU2677433C1 |
COOLING TOWER SPRINKLER UNIT | 2019 |
|
RU2727738C1 |
COOLING TOWER SPRINKLER | 2007 |
|
RU2355972C2 |
COOLING TOWER SPRINKLER UNIT | 2010 |
|
RU2428645C1 |
SPRAYING UNIT OF THE WATER-COOLING TOWER | 2006 |
|
RU2309356C1 |
COOLING TOWER SPRINKLER UNIT | 2016 |
|
RU2635726C2 |
COOLING TOWER SPRINKLER UNIT | 2016 |
|
RU2636593C2 |
SPRINKLING UNIT FOR WATER-COOLING TOWER | 2006 |
|
RU2319919C1 |
WATER COOLING TOWER SPRINKLER FILTER UNIT | 2007 |
|
RU2359195C1 |
SPRINKLER BLOCK OF A COOLING TOWER | 2006 |
|
RU2317502C1 |
Authors
Dates
2007-05-27—Published
2006-02-28—Filed