PROCEDURE AND DEVICE FOR INTRAWELL SELECTIVE COMMUNICATION BY MEANS OF FLUID MEDIUM Russian patent published in 2010 - IPC E21B43/11 

Abstract RU 2401936 C1

FIELD: oil and gas production.

SUBSTANCE: procedures and device are designed for perforating formation in bore of well without perforating casing of well bore. The procedure and device consist of a perforating device positioned outside of the casing without perforating the casing. An internal part of the perforating device functions as a tract for fluid medium flow between the casing and formation after perforation. A valve in the casing selectively opens and closes the flow tract.

EFFECT: improvement of procedure and devices for selective control of communication with one or several formations.

36 cl, 4 dwg

Similar patents RU2401936C1

Title Year Author Number
ASSEMBLY AND METHOD FOR FLOW INTENSIFICATION BY HYDRAULIC FRACTURING IN SEVERAL ZONES USING INDEPENDENT UNITS IN PIPE SYSTEMS 2011
  • Tolman Rehndi K.
  • Ehntchev Pavlin B.
  • Ankheles Bosa Renso M.
  • Petri Dennis Kh.
  • Sirls Kevin Kh.
  • Ehl'-Rabaa Abdel' Vadud Mokhammed
RU2571460C2
METHOD OF ELIMINATING PROPPANT DEPOSITION CONDITIONS DURING WELL COMPLETION 2015
  • Tolman, Randy, C.
  • Morrow, Timothy, I
  • Benish, Timothy, G.
RU2658400C1
FACILITY AND METHODS FOR REMOVING FILTER CAKE FROM UNCASED BOREHOLE OF WELL 2005
  • Chang Frehnk F.
  • Bermann Lourens A.
  • Uolton Iehn S.
  • Chan' Kehn Sehn
RU2360100C2
METHOD OF ELIMINATING PROPPANT DEPOSITION CONDITIONS DURING WELL COMPLETION 2015
  • Tolman Rendi K.
  • Morrou Timoti I.
  • Benish Timoti G.
RU2664989C1
MULTIZONE WELL COMPLETION METHOD AND SYSTEM (VARIANTS) 2005
  • Lopes De Kardenas Khorkhe
  • Ritlevski Gari L.
  • Khehkvort Mehtt'Ju R.
  • Uitsitt Dzhon R.
  • Garsia Khose F.
RU2310066C2
SYSTEM FOR REPEATED ISOLATION OF ACCESS TO BOREHOLE 2016
  • Stajler, Grekhem
  • Makmillan, Gevin
RU2686746C1
MULTI-ZONE COMPLETION WITH FORMATION HYDRAULIC FRACTURING 2012
  • Rejvensbergen Dzhon Edvard
  • Lon Lajl Ervin
  • Misselbruk Dzhon Dzh.
RU2601641C2
METHOD AND FACILITY FOR CONTROL OVER UNSTABLE STATE IN WELL BOREHOLE 2003
  • Dzhonson Ehshli B.
  • Bermann Lourens A.
  • Jang Venbo
  • Dornbos Fokko Kh.K.
  • Uolton Jan S.
RU2352769C2
HYDRAULIC FRACTURING METHOD 2009
  • Snajder, Filip M.
  • Perkis, Daniel G.
RU2535868C1
SYSTEM AND PROCEDURE FOR BOREHOLE OF WELL PERFORATION 2007
  • Khromas Dzho K.
  • Grigar Larri
RU2428561C2

RU 2 401 936 C1

Authors

Vesson Dehvid S.

Dzhordzh Kevin R.

Snajder Filip M.

Dates

2010-10-20Published

2007-08-29Filed