FIELD: oil and gas production.
SUBSTANCE: one of versions of reservoir perforating procedure in underground well consists in reducing existing stress in well reservoir causing growth of threshold pressure of fluid medium at reduced operating stress of perforated reservoir in first borehole of well. Reduced stress of the reservoir additionally rises pressure in the second borehole of the well, thus lowering mechanical stress near the first borehole of the well. The perforation system consists of the first tool for reduction of existent stress in the reservoir by increasing threshold pressure of fluid medium in the first borehole of the well through pressure rise in the second borehole of the well and of the perforating tool. Also, the perforating tool is positioned in the first borehole of the well for perforation of the reservoir at lowered stress.
EFFECT: increased depth of perforation.
29 cl, 9 dwg
Title | Year | Author | Number |
---|---|---|---|
ASSEMBLY AND METHOD FOR FLOW INTENSIFICATION BY HYDRAULIC FRACTURING IN SEVERAL ZONES USING INDEPENDENT UNITS IN PIPE SYSTEMS | 2011 |
|
RU2571460C2 |
METHOD AND FACILITY FOR CONTROL OVER UNSTABLE STATE IN WELL BOREHOLE | 2003 |
|
RU2352769C2 |
METHOD FOR DYNAMIC PRESSURE REGULATION DURING WELL PERFORATION (VARIANTS) | 2004 |
|
RU2300626C2 |
DOWNHOLE SAMPLER AND METHOD OF WELL SAMPLING | 2004 |
|
RU2348807C2 |
METHOD AND DEVICES TO CREATE TRANSITION PRESSURE CONDITION INSIDE WELL BORE | 2005 |
|
RU2310067C2 |
METHOD OF ELIMINATING PROPPANT DEPOSITION CONDITIONS DURING WELL COMPLETION | 2015 |
|
RU2658400C1 |
FACILITY AND METHODS FOR REMOVING FILTER CAKE FROM UNCASED BOREHOLE OF WELL | 2005 |
|
RU2360100C2 |
DEVICE TO DETERMINE FORMATION CHARACTERISTICS (VERSIONS) | 2005 |
|
RU2378511C2 |
METHOD OF ELIMINATING PROPPANT DEPOSITION CONDITIONS DURING WELL COMPLETION | 2015 |
|
RU2664989C1 |
PROCEDURE FOR INCREASED PRODUCTION OF METHANE FROM COAL BEARING STRATA BY RAPID OXIDATION (VERSIONS) | 2007 |
|
RU2427707C2 |
Authors
Dates
2011-04-10—Published
2006-04-20—Filed