PROCEDURES AND SYSTEM FOR PERFORATING RESERVOIR IN UNDERGROUND WELL Russian patent published in 2011 - IPC E21B43/11 E21B43/25 

Abstract RU 2416022 C2

FIELD: oil and gas production.

SUBSTANCE: one of versions of reservoir perforating procedure in underground well consists in reducing existing stress in well reservoir causing growth of threshold pressure of fluid medium at reduced operating stress of perforated reservoir in first borehole of well. Reduced stress of the reservoir additionally rises pressure in the second borehole of the well, thus lowering mechanical stress near the first borehole of the well. The perforation system consists of the first tool for reduction of existent stress in the reservoir by increasing threshold pressure of fluid medium in the first borehole of the well through pressure rise in the second borehole of the well and of the perforating tool. Also, the perforating tool is positioned in the first borehole of the well for perforation of the reservoir at lowered stress.

EFFECT: increased depth of perforation.

29 cl, 9 dwg

Similar patents RU2416022C2

Title Year Author Number
ASSEMBLY AND METHOD FOR FLOW INTENSIFICATION BY HYDRAULIC FRACTURING IN SEVERAL ZONES USING INDEPENDENT UNITS IN PIPE SYSTEMS 2011
  • Tolman Rehndi K.
  • Ehntchev Pavlin B.
  • Ankheles Bosa Renso M.
  • Petri Dennis Kh.
  • Sirls Kevin Kh.
  • Ehl'-Rabaa Abdel' Vadud Mokhammed
RU2571460C2
METHOD AND FACILITY FOR CONTROL OVER UNSTABLE STATE IN WELL BOREHOLE 2003
  • Dzhonson Ehshli B.
  • Bermann Lourens A.
  • Jang Venbo
  • Dornbos Fokko Kh.K.
  • Uolton Jan S.
RU2352769C2
METHOD FOR DYNAMIC PRESSURE REGULATION DURING WELL PERFORATION (VARIANTS) 2004
  • Uolton Jan
  • Chang Frehnk F.
RU2300626C2
DOWNHOLE SAMPLER AND METHOD OF WELL SAMPLING 2004
  • Fildz Troj
RU2348807C2
METHOD AND DEVICES TO CREATE TRANSITION PRESSURE CONDITION INSIDE WELL BORE 2005
  • Ratanasirigulchai Vanchai
  • Bermann Lourens A.
  • Martin Ehndrju Dzh.
  • Gudmehn Kennet R.
RU2310067C2
METHOD OF ELIMINATING PROPPANT DEPOSITION CONDITIONS DURING WELL COMPLETION 2015
  • Tolman, Randy, C.
  • Morrow, Timothy, I
  • Benish, Timothy, G.
RU2658400C1
FACILITY AND METHODS FOR REMOVING FILTER CAKE FROM UNCASED BOREHOLE OF WELL 2005
  • Chang Frehnk F.
  • Bermann Lourens A.
  • Uolton Iehn S.
  • Chan' Kehn Sehn
RU2360100C2
DEVICE TO DETERMINE FORMATION CHARACTERISTICS (VERSIONS) 2005
  • Fildz Troj
  • Brokmejer Ojvind
  • Khehrrigan Ehdvard
  • Khill Bunker
  • Fenski Charl'Z
  • Agbali Ali
  • Del Kampo Kristofer
RU2378511C2
METHOD OF ELIMINATING PROPPANT DEPOSITION CONDITIONS DURING WELL COMPLETION 2015
  • Tolman Rendi K.
  • Morrou Timoti I.
  • Benish Timoti G.
RU2664989C1
PROCEDURE FOR INCREASED PRODUCTION OF METHANE FROM COAL BEARING STRATA BY RAPID OXIDATION (VERSIONS) 2007
  • Olsen Tom
RU2427707C2

RU 2 416 022 C2

Authors

Grouv Brenden M.

Dates

2011-04-10Published

2006-04-20Filed