FIELD: oil production, particularly operation of producing strings of injection and producing wells, as well as delivery lines and oil pipelines.
SUBSTANCE: method involves constructing well and pipeline; linking cathodic protection to well and pipeline; arranging drainage unit at well site; arranging anode bed from both pipeline sides; performing test cathodic well protection switching-on; determining pipeline protection degree; determining longitudinal pipeline resistance, transition pipeline resistance, distance between pipeline and anode bed, cathodic station output voltage, cathodic station output power, summary electrode mass and number of electrodes in anodic bed and protective current value to provide necessary length of zone to be protected for total pipeline protection; operating well and pipeline with predetermined cathodic protection.
EFFECT: decreased power inputs of joint well and pipeline operation.
1 ex, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
OPERATION METHOD FOR OIL DISCHARGE AND OIL RESERVOIR PRESSURE MAINTENANCE SYSTEMS | 2006 |
|
RU2303122C1 |
METHOD FOR OPERATION OF PIPELINES OF OIL COLLECTION AND RESERVOIR PRESSURE MAINTENANCE OF OIL DEPOSIT | 2015 |
|
RU2593855C1 |
METHOD FOR OPERATION OF PIPELINES OF OIL COLLECTION AND RESERVOIR PRESSURE MAINTENANCE OF OIL DEPOSIT | 2015 |
|
RU2588916C1 |
CATHODIC PROTECTION FOR CASING STRINGS AND OILFIELD PIPELINES AGAINST CORROSION AND DEVICE FOR METHOD IMPLEMENTATION | 2014 |
|
RU2571104C1 |
METHOD OF CREATING ARTIFICIAL STRAY CURRENT AND POTENTIAL OF COMPLEX SHAPE FOR SECTION OF UNDERGROUND PIPELINE ON EXPERIMENTAL AND TRAINING MODEL OF DRAINAGE PROTECTION OF ELECTROCHEMICAL PROTECTION GROUND | 2023 |
|
RU2822315C1 |
METHOD OF CATHODE PROTECTION OF CASING STRINGS OF WELLS AND OIL-FIELD PIPELINES AGAINST CORROSION | 2016 |
|
RU2636540C1 |
METHOD OF CATHODE PROTECTION OF CASING STRINGS OF WELLS AND OIL-FIELD PIPELINES AGAINST CORROSION | 2016 |
|
RU2636539C1 |
METHOD FOR ANTI-CORROSIVE PROTECTION OF MAIN PIPELINE IN URBAN CONDITIONS. | 2020 |
|
RU2749962C1 |
ANODE GROUNDING UNIT MAINTENANCE TIMING PREDICTION TOOL | 2020 |
|
RU2744491C1 |
METHOD FOR FINDING THE NUMBER OF ADDITIONAL ANODIC GROUNDINGS REQUIRED TO PROVIDE PROTECTIVE DIFFERENCE OF POTENTIALS "PIPE-EARTH" IN A PIPELINE SECTION | 2021 |
|
RU2777824C1 |
Authors
Dates
2007-07-20—Published
2006-09-27—Filed