METHOD FOR LATTICE SPAN STRUCTURE DISASSEMBLING BY SPAN STRUCTURE DIVISION INTO THREE-DIMENSIONAL BLOCKS Russian patent published in 2007 - IPC E01D22/00 

Abstract RU 2304656 C1

FIELD: bridge construction, particularly to disassemble metal span structures (trusses) for overhaul of bridge included in existent motor roads or motor roads under construction.

SUBSTANCE: method for bridge span having upper belt height of up to 30-35 m over water surface and length of more than 40 m involves constructing temporary supplementary piers in areas of span structure separation into three-dimensional blocks; installing hydraulic jacks on temporary piers under lower truss joints; provisionally retaining thereof against vertical displacement for at least span structure separation time by shimming thereof with steel sheets arranged at permanent or supplementary supports; separating span structure into three-dimensional blocks having lengths of not less than 20 m by cutting-off separate truss members along with internal truss strain regulation to provide internal truss strain within the range of static load applied to truss members and not exceeding design load by shimming and/or by means of hydraulic jacks installed at supplementary piers; performing block strapping; releasing three-dimensional blocks and demounting thereof with the use of floating crane with at least 80 tons lifting capacity; moving three-dimensional blocks to preliminarily prepared receiving building berths for further division thereof onto smaller parts; demounting temporary piers. Bridge span structure may be separated beginning with upper belt and then lower belt is disintegrated starting with upper truss plane. The receiving building berths are arranged on banks. Separated three-dimensional blocks are moved to the berths by means of floating crane immediately after demounting thereof so that this becomes unnecessary to transmit the block on barge or pontoon. In another embodiment the receiving building berths may be formed on banks and three-dimensional blocks may be moved thereto by means of floating crane after block laying on barge or pontoon.

EFFECT: possibility of bridge disassembling without water body occupation with floating crafts and temporary supports, as well as decreased labor inputs and costs of bridge disassembling.

4 cl, 4 dwg

Similar patents RU2304656C1

Title Year Author Number
REMOVAL METHOD OF BRIDGE SUPERSTRUCTURE USING CABLE-SUPPORTED SYSTEM 2013
  • Sakharova Inna Dmitrievna
  • Kazarjan Vil'Gel'M Jur'Evich
  • Kosolapov Andrej Vladimirovich
RU2534557C1
REMOVAL METHOD OF GIRDER REINFORCED-CONCRETE SUPERSTRUCTURE OF BRIDGE USING CABLE-SUPPORTED SYSTEM 2013
  • Sakharova Inna Dmitrievna
  • Kazarjan Vil'Gel'M Jur'Evich
RU2534556C1
METHOD OF RECONSTRUCTION OF BRIDGEWORK WITH DISPLACEMENT OF RAILWAY BRIDGE FRAMEWORK AFLOAT AND ERECTION OF PEDESTRIAN BRIDGE 2000
RU2198978C2
METHOD FOR ERECTION OF PEDESTRIAN OVERPASS 1999
  • Gapontsev E.G.
  • Dorman I.Ja.
  • Isakov V.V.
  • Korotin V.N.
  • Kobzev G.N.
  • Monov B.N.
  • Onishchuk V.M.
  • Ostrovskij A.V.
  • Platonov Ju.P.
  • Ryzhikov A.V.
  • Selivanov N.P.
  • Shmidt V.I.
RU2152475C1
METHOD FOR RECONSTRUCTION OF OVERPASS WITH DISPLACEMENT OF RECONSTRUCTED RAILWAY BRIDGE AFLOAT 1999
  • Gapontsev E.G.
  • Dorman I.Ja.
  • Isakov V.V.
  • Korotin V.N.
  • Kobzev G.N.
  • Monov B.N.
  • Onishchuk V.M.
  • Ostrovskij A.V.
  • Platonov Ju.P.
  • Ryzhikov A.V.
  • Selivanov N.P.
  • Shmidt V.I.
RU2152477C1
SCAFFOLD FOR BRIDGE SPAN STRUCTURE MOUNTING 2004
  • Karchenkov Valentin Semenovich
  • Kharebava Zhilo Antonovich
  • Chepurnov Konstantin Gavrilovich
  • Pavljukov Jurij Aleksandrovich
  • Biktashev Rafik Khanefaevich
  • Velichko Vladimir Pavlovich
  • Passek Vadim Vasil'Evich
RU2275455C2
SPAN STRUCTURE ASSEMBLAGE METHOD AND HOISTING DEVICE FOR ABOVE METHOD REALIZATION 2006
  • Kochergin Igor' Jur'Evich
RU2301294C1
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE 2023
  • Bellendir Evgenij Nikolaevich
  • Illarionov Aleksandr Gennadevich
  • Budarin Aleksandr Mikhajlovich
  • Rempel Georgij Igorevich
  • Butovka Aleksej Nikolaevich
  • Kretov Dmitrij Aleksandrovich
RU2815705C1
METHOD OF BRIDGE SPAN ASSEMBLY 2008
  • Gur'Janov Jurij Aleksandrovich
  • Pshenichnikov Stanislav Konstantinovich
  • Dankovtsev Aleksandr Fedorovich
  • Kotov Valerij Anatol'Evich
RU2385982C1
PREFABRICATED SPAN STRUCTURE 2023
  • Yudina Antonina Fedorovna
  • Rozantseva Nadezhda Vladimirovna
RU2814086C1

RU 2 304 656 C1

Authors

Afanas'Ev Andrej Gel'Evich

Rudenko Aleksandr Egorovich

Solomin Sergej Pavlovich

Respublikanskij Andrej Rjurikovich

Dates

2007-08-20Published

2006-02-03Filed