FIELD: oil and gas production, particularly packing equipment used during oil well operation and development.
SUBSTANCE: packer comprises hollow mandrel 1 and sealing member 2. Packer has at least one through multifunctional channel. The channel is arranged between hollow mandrel 1 and sealing member 2 so that the channel crosses sealing member 2 location zone. The channel is filled with filler 4, namely with gas-permeable one or with gas-permeable and gas-tight fillers in the case of channel division into longitudinal sections a, b, c, d.
EFFECT: extended functional capabilities and increased operational efficiency during well pumping.
9 cl, 4 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
GARIPOV CIRCULATION PACKER | 2006 |
|
RU2334077C1 |
METHOD OF GARIPOV FOR OIL PRODUCTION AND DEVICE FOR ITS REALISATION | 2009 |
|
RU2405918C1 |
GARIPOV WELL PUMP PACKER INSTALLATION | 2010 |
|
RU2439374C1 |
GARIPOV HYDRAULIC REUSABLE PACKER, INSTALLATION AND METHOD FOR ITS IMPLEMENTATION | 2010 |
|
RU2425955C1 |
PROCEDURE FOR PREPARING WELL PUMP EQUIPMENT BY GARIPOV TO OPERATION | 2009 |
|
RU2414584C1 |
GARIPOV PACKER WITH ELECTRONIC INSTRUMENT (VERSIONS) AND METHOD OF ITS IMPLEMENTATION | 2011 |
|
RU2500879C2 |
GARIPOV METHOD OF SIMULTANEOUS SEPARATE PRODUCTION OF HYDROCARBONS AND EQUIPMENT FOR ITS IMPLEMENTATION | 2012 |
|
RU2498053C1 |
DOWNHOLE PUMP UNIT | 2011 |
|
RU2506416C1 |
METHOD OF GARIPOV'S WELL OPERATION AND DEVICE FOR ITS REALISATION (VERSIONS) | 2008 |
|
RU2398100C2 |
PROCEDURE FOR COMPLETION AND OPERATION OF WELL | 2009 |
|
RU2394978C1 |
Authors
Dates
2007-09-10—Published
2006-01-10—Filed