DRILLING-AND-HOISTING RIG Russian patent published in 2007 - IPC E21B7/02 E21B3/02 

Abstract RU 2306398 C1

FIELD: drilling rigs characterized by means for land transport, namely rigs for well drilling and communication and power transmission line post installation in wells.

SUBSTANCE: drilling-and-hoisting rig comprises basic chassis with power plant and transmission, as well as boring mast. Swivel, drill rod, drill rod rotator and drill tool are mounted in the boring mast. Pulleys adapted to lift and lower swivel with drill rod are arranged in upper part thereof. Drilling-and-hoisting rig has hook suspension having fixer, single drum winch, pulley system and rope. Drill rod is made as hollow thin-walled pipe having round cross-section. Rotator is aligned with swivel. Upper drill rod end is connected to rotator by means of square shank. Lower movable drill rod part is mounted in guiding means formed as pipe section having diameter exceeding outer rod diameter. Guiding means is installed in lower drilling mast part. Rotator is kinematically connected with basic chassis transmission by means of two-stage chain loop. The first stage of the loop is supported by sprockets. One sprocket is connected to output transmission shaft end. Another one is mounted on remote end of lower elongated beam. The second loop stage is mounted on short beam of long and short beams joined with each other by ends thereof. Upper beam end remote from common rotation axis thereof is connected to horizontal axis of symmetry of receiving rotator shaft in the same way. Each chain loop is provided with toothed chain having sliding hinge. Each chain loop also has tightening roller carried by movable beam.

EFFECT: increased drilling efficiency, simplified structure and operational reliability.

3 cl, 7 dwg

Similar patents RU2306398C1

Title Year Author Number
DRILLING-CRANE MACHINE 0
  • Nikitenko Petr Ivanovich
  • Tondel Arkadij Ivanovich
  • Mozhejko Leonid Ivanovich
SU777195A1
INSTALLATION FOR DRILLING, TESTING AND REPAIR OF OIL AND GAS WELLS UPA-80 2007
  • Orlov Nikolaj Grigor'Evich
  • Sharafutdinov Gafur Saburovich
  • Pishchaev Denis Vladimirovich
RU2362868C1
HOIST UNIT FOR COMPLETION AND REPAIR OF OIL AND GAS WELLS UPA 60A 2007
  • Orlov Nikolaj Grigor'Evich
  • Sharafutdinov Gafur Saburovich
  • Pishchaev Denis Vladimirovich
RU2362867C2
DRILLING RIG WITH TELESCOPIC MAST 2022
  • Yurin Sergej Aleksandrovich
RU2799924C1
WELL DRILLING METHOD AND SELF-MOVING DRILLING RIG FOR ABOVE METHOD REALIZATION 2004
  • Lymar' Nikolaj Vasil'Evich
  • Lymar' Vasilij Vasil'Evich
RU2276245C2
METHOD OF INSTALLING MOUNTED EQUIPMENT OF BERKUT DRILL-PILE DRIVER 2001
  • Zlygostev N.K.
  • Putilin V.P.
  • Sosnovskikh V.A.
  • Svakhin A.K.
RU2196203C1
REPAIR-BORING AGGREGATE AP32/40 2007
  • Iskandarov Rais Nizamievich
  • Urzhumov Anatolij Vladimirovich
  • Kuznetsov Nikolaj Ivanovich
RU2380512C2
DRILLING-CRANE MACHINE 2006
  • Mal'Kov Igor' Ivanovich
RU2296851C1
MOBILE REPAIR-DRILLING UNIT 2002
  • Jusupov R.A.
  • Nikitenko Ju.N.
  • Abakumov G.I.
  • Popov N.I.
  • Loginov G.F.
  • Vanjukov S.M.
  • Kuznetsov N.I.
RU2204680C1
ZBT-600 EXPLORATION DRILLING DIRECTORATE MULTI-PURPOSE SYSTEM FOR GEOLOGICAL RESEARCHES 2015
  • Kondratev Roman Aleksandrovich
  • Nikanov Sergej Valentinovich
  • Tashmatov Valerij Valerevich
  • Boldyrev Gennadij Grigorevich
  • Pestovnikov Roman Sergeevich
  • Glavatskikh Kirill Aleksandrovich
  • Golubkov Vladimir Leonidovich
RU2601350C1

RU 2 306 398 C1

Authors

Saldaev Aleksandr Makarovich

Saldaev Nikita Dmitrievich

Saldaeva Julija Gennad'Evna

Saldaev Dmitrij Aleksandrovich

Saldaev Gennadij Aleksandrovich

Krivel'Skaja Natal'Ja Vladimirovna

Dates

2007-09-20Published

2006-05-12Filed