FIELD: oil industry, particularly for well operation with simultaneous or periodic liquid discharge and measurement talking.
SUBSTANCE: method involves lowering two pipe strings in well; taking reservoir fluid via the first pipe string and lowering measuring instrument via the second string, wherein the second pipe string has length exceeding that of the first one; arranging separating shoe at the first string bottom; connecting both pipe strings by means of separating shoe; connecting pipes of the second pipe string through perforated nipples below separation shot. Ratio between nipples and solid pipes is 1:(2÷4). Number of orifices in nipples is 10-20 per 1 m, diameter thereof is 10-14 mm. Spherical funnel is installed at the second pipe string end.
EFFECT: provision of measurements carrying out at well bottom with simultaneous reservoir fluid taking.
1 ex, 3 dwg
| Title | Year | Author | Number |
|---|---|---|---|
| HORIZONTAL WELL COMPLETION METHOD | 2015 |
|
RU2588108C1 |
| METHOD FOR TREATMENT OF FACE-ADJACENT WELL AREA | 2004 |
|
RU2244808C1 |
| WELL COMPLETION METHOD, EXPOSING PRODUCTIVE FORMATION LOCATED NEAR WATER-SATURATED FORMATION | 2015 |
|
RU2579069C1 |
| METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL DEPOSIT | 2015 |
|
RU2599118C1 |
| WELL CONSTRUCTION AND OPERATION METHOD | 2005 |
|
RU2320849C2 |
| METHOD FOR SIMULTANEOUS SEPARATE PRODUCTION OF OIL FROM TWO FORMATIONS OF ONE WELL BY PRODUCTION STRING | 2020 |
|
RU2738615C1 |
| METHOD FOR DEVELOPING LAYER OF ULTRA-VISCOUS OIL BY UNIFORM VAPOR-GRAVITY ACTION | 2021 |
|
RU2749703C1 |
| METHOD OF WELL DEVELOPMENT | 2012 |
|
RU2480580C1 |
| METHOD OF DEVELOPMENT OF MULTIRESERVOIR OIL DEPOSITS | 2014 |
|
RU2547857C1 |
| WELL CLEANING METHOD | 2011 |
|
RU2451159C1 |
Authors
Dates
2007-12-27—Published
2007-02-13—Filed