FIELD: industrial and civil construction, particularly to erect new buildings, to reinforce foundations of existent buildings and building structures and to construct supports taking alternating loads.
SUBSTANCE: method involves forming pilot hole in ground by hole drilling along with delivering cut ground to ground surface by means of hollow auger drilling assembly provided with rock-cutting tool; removing hollow auger drilling assembly with rock-cutting tool from hole; arranging metal frame in hole and filling holes with concrete. Helical groove is created in pilot hole wall so that helix lead may be changed. Concrete mix is supplied through inner channel of auger drilling assembly to fill cavity formed in pilot hole and helical slot as drilling assembly moves upwards. Metal frame is arranged in hole after total drilling assembly removal from hole and hole filling with concrete mix.
EFFECT: increased load-bearing capacity of bored pile and extended field of application due to possibility of said method usage for foundation construction in any ground.
5 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
BORED AUGER PILE INSTALLATION DEVICE | 2007 |
|
RU2328575C1 |
METHOD FOR BORED PILE ERECTION | 2007 |
|
RU2319808C1 |
DEVICE FOR ERECTION OF BORED SCREW PILES | 2008 |
|
RU2439247C2 |
METHOD OF BORED PILE CONSTRUCTION AND DEVICE FOR METHOD IMPLEMENTATION | 2007 |
|
RU2354781C2 |
SYSTEM FOR BORED PILES CONSTRUCTION | 2007 |
|
RU2333315C1 |
DEVICE FOR BORED PILE CONSTRUCTION | 2008 |
|
RU2367741C1 |
DEVICE FOR ERECTION OF DRILLED PILE | 2009 |
|
RU2398932C1 |
METHOD FOR CONSTRUCTING BORED PILE IN SOIL | 2023 |
|
RU2804651C1 |
DEVICE FOR PERFORMANCE OF STATIC PROBING OF SOILS WITH VARIABLE DENSITY | 2008 |
|
RU2378452C1 |
BORED PILE DEVICE METHOD | 2019 |
|
RU2717554C1 |
Authors
Dates
2008-02-20—Published
2007-01-30—Filed